16
9. SHOWER CEILING
lm from the roof/ceiling.
t the monsoon rain
shower head into the centre of the roof. It is held
in place with a retaining nut located on the outer/
upper face of the roof.
tted. Ensure
all the cables are unraveled to enable location and
connection at a later stage.
The Ozone unit is supplied separately and will
the main body of the ozone. Position the white
unit on the up (outside) of the roof and fasten in
place by screwing the chrome end into it.
The Ozone will be located over the hole in the roof
towards the back corner.
You can now place the ceiling onto the shower. The
front will sit behind the front silver frame and the
rear will rest on the top of the rear glass panels.
xed in position at the REAR ONLY by
screwing up through the re-drilled holes in the rear
panel, into the ceiling. Fixing requires 3 of the short
Now ensure all the cables for the ozone, light, fan
and speaker are hanging down the back of the
shower ready to connect.
REPLACING THE CEILING LIGHT
Your shower is fi tted with an LED ‘Halo’ Ring light. This light should provide a long service life if
used correctly. If you need to change your ceiling light once the shower is installed, please turn
off the water to the shower fi rst, then disconnect the water supply pipe to the monsoon rain
shower on the roof of the shower. Loosen the retaining bolt for the monsoon and lower into the
shower. (we suggest you have another person inside the shower to hold it from falling).
From inside the shower with the monsoon removed, the light diff user cover will also come free.
Disconnect the power cable to the light on the roof of the shower, unscrew the retaining screws
for the light and remove.
To fi t the replacement, simply reverse the process.
er in shape from this representation
REMOVE PROTECTIVE FILM FROM THE MONSOON
16mm screws, three along each flat side of the ceiling