Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
12
Page 12
U n i v e r s a l T A U - I I
®
C r a s h C u s h i o n
P A R A L L E L S Y S T E M
CONCRETE PAD INSTALLATION
Step 3. (Concrete Front Cable Anchor)
Place the Front Cable Anchor in the desired final
installation position. Use
Appendix C
for layout
dimensions. Use the holes in the plate as a template
to mark the location of the anchor points. Remove
the plate and drill the anchor bolt holes to the desired
size and depth. The holes should be 6” (150 mm)
deep and 7/8” (22 mm) diameter.
NOTE:
It is important that the holes are drilled straight and in
the correct position so that the plate will fit back over
the bolts after they have been set with anchoring
material. If the total hole depth cannot be reached
due to rebar interference, a “diamond tip” drill or
equivalent should be used to reach the total hole
depth.
ASPHALT INSTALLATION
Step 3. (Asphalt Front Cable Anchor)
The Asphalt Front Cable Anchor is a three piece unit.
Place the Front Cable Anchor and the Front Anchor
Backup Plate in the desired final installation position.
Use the holes in the plates as a template to mark the
location of the anchor points. Remove the plates and
drill the anchor bolt holes to the desired size and
depth. The holes should be 15 to 16 ½” (380 to 420
mm) deep and 7/8” (22 mm) diameter.
Install the
cable and clevis pin before installing the Front
Anchor Tie Channel.
Install the Front Anchor Tie
Channel on top of the Front Cable Anchor and the
Front Anchor Backup Plate.
NOTE:
It is important that the holes are drilled straight and in
the correct position so that the plate will fit back over
the bolts after they have been set with anchoring
material. If the total hole depth cannot be reached
due to interference, a “diamond tip” drill or equivalent
should be used to reach the total hole depth.
Use the Front Anchor Plate as a template
Drill the anchor bolt holes to the proper size and depth
Install and torque nuts on the anchor bolts
Front Cable Anchor
Front Anchor
Backup Plate
Front Anchor Tie Channel