![LINDR GREEN LINE KONTAKT 155 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/lindr/green-line-kontakt-155/green-line-kontakt-155_instruction-manual_1919615016.webp)
16
16.4 Keg Untapping
Procedure for untapping a keg using an A-system keg coupler:
fi
gure
16 c
fi
gure
16 d
17. PUTTING INTO OPERATION
1. Interconnect air supply and beverage supply.
2. Set the thermostat to 0 position.
3. Connect the cooler to the power mains.
4. Tap the keg in accordance with point 16.
5. Turn on the air compressor using the switch and pressurise to the required pressure.
6. Check that all the joints and connections are su
ffi
ciently tight.
WARNING:
If a leakage is found, untap the keg according to point 16 and turn o
ff
the
device. Fix any leaks found on the tubing. If a leak is found inside the device or you are unsure
how to proceed, contact a service centre.
7. Use the dispensing tap to let out some of the beverage and check that there is no water in the
device.
WARNING:
Never set the device to maximum cooling if there is water in the device. May
cause freezing of the beverage tubing and damage the device.
8. Set the desired temperature on the thermostat – see point 15.
9. The beverage is now cooling; once cooled (ca. 5-10 minutes) you can start pouring the
fi
rst
drink.
fi
gure
16 a
fi
gure
16 b