Assembly and Disassembly of the Discharge Conveyor Belt Rollers
Wear work gloves when carrying out repair work to reduce the risk of injuries.
Only use suitable and approved hoisting gear.
Disassemble the discharge conveyor belt drive roller in the following order:
1. Drive belt into lowest position.
2. Slacken belt on tightening screws of the head pieces as far as possible.
3. Remove holding screw shaft mounted bevel gear.
4. Remove holding screw drive roller on the opposite side
5. Pull off shaft mounted bevel gear.
6. The hydraulic hoses can remain installed. Put shaft mounted bevel gear with mounted
hoses carefully down on the belt in the upper belt area.
7. Remove head piece on the side of the shaft mounted bevel gear. Attention, drive roller
drops due to its own weight.
8. Take drive roller out towards the side from the head piece opposite side and belt.
Attention, because of the heavy weight use equipment or another person to help you.