Burner Blower Motor 

Visually check to see if motor is running.  If not, 
check for 120 VAC to motor at motor connector (wire 
#5 and #22).  If voltage is not present, trace wiring 
back to fan switch.  If voltage is present and motor is 
not running, check for opens, shorts, or grounds.  
Also, WITH POWER OFF:  check for locked rotor. 

 

Transformer, Burner 

Primary is 120 VAC with 24 VAC secondary.  If 120 
VAC is not present, trace wiring back to Main Fan 
Centrifugal Switch.  If 120 VAC is present, check for 
24 VAC at secondary of transformer.  If no voltage is 
present, replace transformer. 

 

Centrifugal Switch of Burner 
Blower Motor 

Check of 120 VAC at motor connector, on wire #13 
to neutral.  If voltage is not present, trace wiring back 
to transformer.  If voltage is not present and motor is 
running, replace the burner blower motor. 

 

Ignition Control 

24 volts should be present at 24 volt terminals.  If not 
present, trace wiring back to centrifugal switch.  
When 24 VAC is supplied, the control switches 120 
VAC from L1 and L2 to the hot surface ignitor.  if 120 
VAC is not present at L1 and L2, trace wiring  

 

 

back to fan switch.  If 24 VAC and 120 VAC are 
present and 120 VAC is not across the hot surface 
ignitor terminals, replace the ignition control. 

 

Hot Surface Ignitor 

If 120 VAC is present at hot surface ignitor terminals, 
visually check to see that the ignitor is heating.  
(Ignitor may be viewed through the port glass in end 
of burner tube.)  The ignitor should glow bright red.  
If the ignitor does not heat, replace the ignitor. 

 

Ignition Control 

After 45 seconds of hot surface ignitor pre-heat, the 
ignition control will switch 24 VAC to the gas control 
valves.  Check for 24 VAC output from ignition 
control, across terminals marked "valve" and "valve 
ground".  If no voltage is present, replace ignition 
control. 

 

Gas Control Valves 

When 24 VAC is supplied to the gas control valve, 
the valve should open.  Check for gas pressure at 
the manifold tap located just before the burner.  If 
there is no pressure, check the incoming gas supply 
to be sure all manual valves are open and flexible 
gas hose is properly connected.  If gas is present 
and coils of gas valve are energized, the gas valve is 
probably defective. 

Flame will not stay lit 

Hot Surface Ignitor 

Six seconds after the gas valve opens, ignition must 
occur.  if flame is not detected, the ignition control 
will shut off and lock out.  To reset the ignition 
control, turn off the burner switch for 45 seconds, 
then turn on the burner switch to retry ignition.  The 
ignition control requires a minimum of 0.8 D.C. 
microamps.  To check flame sensing operation, 
connect a digital multimeter (capable of measuring 
D.C. micro-amps) between the "ground" terminal on 
ignition control and the ground lead. 

 

 

NOTE:  This is a current measurement and the 
meter must be connected in series.  If these 
readings are not achieved, replace the hot surface 
ignitor. 

 

 

NOTE:  The D.C. micro amp test must be conducted 
with the oven in low flame (bypass) operation.  Turn 
the temperature control to the lowest setting. 

Содержание Impinger II - Advantage Series

Страница 1: ...R OVENS IMPINGER II ADVANTAGE SERIES Lincoln Foodservice Products LLC 1111 North Hadley Road Fort Wayne Indiana 46804 United States of America Phone 800 374 3004 U S Fax 888 790 8193 Int l Fax 260 436...

Страница 2: ...ROUBLESHOOTING GUIDE GAS OVENS 9 TROUBLESHOOTING GUIDE ELECTRIC OVENS 14 REMOVAL INSTALLATION AND ADJUSTMENT 18 PARTS GENERAL 26 BLOW UP GENERAL 27 PARTS CONTROL BOX 1116 000 A 1117 000 A 28 BLOW UP C...

Страница 3: ...AC from the transformer 120 VAC is switched by the ignition control to the hot surface ignitor for 45 seconds for the hot surface ignitor warm up The ignitor glows red 24 VAC is switched to the gas va...

Страница 4: ...d by air pressure from the main fan through the normally closed oven cavity hi limit thermostat to the electronic temperature control The 1K ohm temperature pot is adjusted to desired temperature The...

Страница 5: ...Impinger II Advantage Service Manual Domestic 5 SCHEMATIC 1116 000 A 1117 000 A...

Страница 6: ...Impinger II Advantage Service Manual Domestic 6 SCHEMATIC 1130 000 A 1131 000 A...

Страница 7: ...Impinger II Advantage Service Manual Domestic 7 SCHEMATIC 1132 000 A 1133 000 A...

Страница 8: ...tween switch terminals Cooling Fan 120 VAC should now be at the fan motor If voltage is present check motors for shorts or opens WITH POWER OFF Check for locked rotor No automatic control Incoming Pow...

Страница 9: ...hrough the port glass in end of burner tube The ignitor should glow bright red If the ignitor does not heat replace the ignitor Ignition Control After 45 seconds of hot surface ignitor pre heat the ig...

Страница 10: ...lace ohm meter test leads on the blue and green pot leads Reading should be 1 K ohms Place meter leads across the blue and purple pot leads and rotate knob from high to low Repeat on green and purple...

Страница 11: ...magnet and H S board are not damaged Replace motor as needed Conveyor Check for any mechanical misalignment Also check for worn bearings A conveyor belt that is over tightened will cause excessive be...

Страница 12: ...ge is present at terminals 1 2 and 3 on temperature display but the display is not lighted recheck all connections for tightness If temperature display is still not operating replace the temperature d...

Страница 13: ...at the fan motor If voltage is present check for opens or shorts WITH POWER OFF Check for locked rotor of the fan motor No automatic control box cooling Incoming Power Supply Check circuit breakers Re...

Страница 14: ...tor will not activate replace the contactor Also check each contactor for proper high voltage input and output Heater Elements Check the amp draw on each hot leg for proper load Check the specificatio...

Страница 15: ...each lead to ground Check motor brushes From the top of the motor rotate motor shaft to determine if there is a locked rotor or a locked gear box use care so magnet and H S board are not damaged Repl...

Страница 16: ...15 VAC Terminals 1 2 and 2 3 should be 1 2 the voltage reading from 1 3 if the above secondary readings are not achieved replace transformer Temperature Display If proper voltage is present at termina...

Страница 17: ...assembly is set on the oven back align motor shaft in the center of the hole Set fan assembly on the motor shaft NOTE It is recommended that an anti seize compound be brushed on to the bolts around th...

Страница 18: ...d wires and mark for reassembly 4 Remove two 2 screws and remove thermostat 5 Reassemble in reverse order BURNER BLOWER MOTOR REPLACEMENT 1 Shut off power at main breaker 2 Remove control panel top an...

Страница 19: ...at 72 F should be 1 134 When using the following chart the temperature at the terminal connections must be noted This temperature is called the Junction Temperature The following chart lists the therm...

Страница 20: ...m operation HEAT LIGHT REPLACEMENT 1 Shut off power at main breaker 2 Remove control panel top and front panel 3 Remove two wires from burner light note number and location 4 Grasp body of light assem...

Страница 21: ...ectrical plug from the burner cap 6 Remove Temperature Regulation Valve 7 Remove 3 screws holding burner cap to burner tube 8 Pull out on burner cap removing cap and burner venturi 9 The hot surface i...

Страница 22: ...to 327 5 Hz 4 Set control knob to 30 minute setting and adjust min pot on conveyor control to 10 9 Hz Recheck at one minute and 30 minutes until proper readings are achieved Seal pots with glyptol or...

Страница 23: ...splay and mark wires for reassembly 4 Pry temperature display to remove from mounting tabs this is a pressure fit 5 Reassemble in reverse order CALIBRATION OF TEMPERATURE DISPLAY 1 Place the thermocou...

Страница 24: ...ents to be sure they ar the proper replacement 9 Reassemble in reverse order Apply anti seize compound to back bolt threads before reassembly NOTE Be sure the lead terminals are tight If the leads are...

Страница 25: ...Impinger II Advantage Service Manual Domestic 25 This page intentionally left blank...

Страница 26: ...l see Installation Operations Manual D 370010 Bottom Finger Housing E 369504 Top Finger Housing F Columnating Panel see Installation Operations Manual G 369503 Top Finger Cover H 369511 Oven Top I 369...

Страница 27: ...Impinger II Advantage Service Manual Domestic 27 BLOW UP GENERAL...

Страница 28: ...urner R 369568 Venturi Natural Gas 369938 Venturi LP Gas S 369552 Hot Surface Ignitor T 369398 Solenoid Valve U 369366 Burner Blower Motor V 369401 Air Shutter Assembly W 370072 Transformer Temperatur...

Страница 29: ...Impinger II Advantage Service Manual Domestic 29 BLOW UP CONTROL BOX 1116 000 A 1117 000 A...

Страница 30: ...or M 370061 Conveyor Motor Assembly Includes K L N 369131 Thermocouple O 369378 Cooling Fan P 370067 Mercury Contactor 1 Phase 369479 Mercury Contactor 3 Phase Q 370072 Transformer Temperature Display...

Страница 31: ...Impinger II Advantage Service Manual Domestic 31 BLOW UP CONTROL BOX 1130 000 A THRU 1133 000 A...

Страница 32: ...Sprocket Heavy Duty Conveyor 369978 Set Screw M 369238 Drive Shaft N 369513 Hinge O 369510 Door Assembly Includes N P and Q P 370016 Impinger Nameplate Q 369501 Door Latch Catch R 1123D Door With Wind...

Страница 33: ...Impinger II Advantage Service Manual Domestic 33 BLOW UP CONVEYOR DOOR...

Страница 34: ...D 369183 Heating Element 208V 369184 Heating Element 240V E 369976 Rear Wall Gas Ovens 369549 Rear Wall Electric Ovens F 369581 Motor Mount G 369539 Motor Gas Ovens 120V 369181 Motor Electric Ovens 2...

Страница 35: ...Impinger II Advantage Service Manual Domestic 35 BLOW UP OVEN BACK ASSEMBLY...

Страница 36: ...Impinger II Advantage Service Manual Domestic 36...

Отзывы: