![Lincoln Impinger II - Advantage Series Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/lincoln/impinger-ii-advantage-series/impinger-ii-advantage-series_service-manual_1917805023.webp)
Impinger II –Advantage Service Manual - Domestic
23
HALL EFFECT SENSOR - REPLACEMENT
1.
Shut off power at main breaker.
2.
Remove control panel top and front cover.
3.
Remove conveyor motor assembly.
4.
Remove wire connector from hall effect sensor board.
5.
Remove two (2) screws from conveyor drive motor.
6.
Remove sensor board from mounting bracket.
7.
Reassemble in reverse order.
8.
Reinstall plug on hall effect sensor board and check conveyor system operation.
9.
Replace control box covers and check system operation.
TEMPERATURE DISPLAY TRANSFORMER - REPLACEMENT
1.
Shut off power at main breaker.
2.
Remove control panel top and front cover.
3.
Remove two (2) wires on primary side, note color and location.
4.
Remove three (3) wires on secondary side, note color and location.
5.
Remove two (2) screws from transformer base and replace assembly.
6.
Reinstall in reverse order and check system operation.
TEMPERATURE DISPLAY - REPLACEMENT
1.
Shut off power at main breaker.
2.
Remove control panel top and front cover.
3.
Remove all wires from temperature display and mark wires for reassembly.
4.
Pry temperature display to remove from mounting tabs (this is a pressure fit).
5.
Reassemble in reverse order.
CALIBRATION OF TEMPERATURE DISPLAY
1.
Place the thermocouple of your test meter through a finger hole in the top center of the oven. Pre-heat
the oven to 500°F for 30 minutes.
2.
Set switch on back of temperature display to read desired temperature (°F or °C).
3.
Adjust "Temp. Adj." pot on back of temperature display until display matches actual oven temperature.
MERCURY CONTACTOR - REPLACEMENT
1.
Shut off power at main breaker.
2.
Remove control panel top and front cover.
3.
Disconnect all wires and mark for reassembly.
4.
Remove screws from mounting bracket and remove contactor.
5.
Reassemble in reverse order.
AIR PRESSURE SWITCH - REPLACEMENT
1.
Shut off power at main breaker.
2.
Remove control panel top and front conveyor.
3.
Disconnect wiring and mark for reassembly.
4.
Disconnect air tube.
5.
Remove mounting screws.
6.
Reassemble in reverse order.
7.
Turn on power and calibrate air switch as follows:
•
Turn adjusting screw counter-clockwise to full out position.
•
Turn oven on.
•
Turn adjusting screw clockwise until heat shuts off.
•
Turn adjusting screw counter-clockwise 1/4 turn and unit should heat.
Содержание Impinger II - Advantage Series
Страница 5: ...Impinger II Advantage Service Manual Domestic 5 SCHEMATIC 1116 000 A 1117 000 A...
Страница 6: ...Impinger II Advantage Service Manual Domestic 6 SCHEMATIC 1130 000 A 1131 000 A...
Страница 7: ...Impinger II Advantage Service Manual Domestic 7 SCHEMATIC 1132 000 A 1133 000 A...
Страница 25: ...Impinger II Advantage Service Manual Domestic 25 This page intentionally left blank...
Страница 27: ...Impinger II Advantage Service Manual Domestic 27 BLOW UP GENERAL...
Страница 29: ...Impinger II Advantage Service Manual Domestic 29 BLOW UP CONTROL BOX 1116 000 A 1117 000 A...
Страница 31: ...Impinger II Advantage Service Manual Domestic 31 BLOW UP CONTROL BOX 1130 000 A THRU 1133 000 A...
Страница 33: ...Impinger II Advantage Service Manual Domestic 33 BLOW UP CONVEYOR DOOR...
Страница 35: ...Impinger II Advantage Service Manual Domestic 35 BLOW UP OVEN BACK ASSEMBLY...
Страница 36: ...Impinger II Advantage Service Manual Domestic 36...