8695 4496 / B
D - ASSEMBLY AND INSTALLATION
FLEXCUT 125 CE INSTALLATION
D-17
1.3
OPERATING TEMPERATURE
The optimum operating conditions range from 0°C to 40°C.
2 - INSTALLATION
Installation is carried out in the following order:
-
placing and securing of each component of the installation
-
connection of each component of the installation, starting with:
-
cycle function
-
the tool-holder
-
the detection cabinet
-
torch
LC125M
-
the power source
Flexcut 125 CE
-
air and power supply.
Содержание FLEXCUT 125 CE
Страница 16: ...C DESCRIPTION 8695 4496 B C 12 FLEXCUT 125 CE INSTALLATION...
Страница 27: ...8695 4496 B D ASSEMBLY AND INSTALLATION FLEXCUT 125 CE INSTALLATION D 23...
Страница 29: ...8695 4496 B E OPERATOR MANUAL FLEXCUT 125 CE INSTALLATION E 25 4 CYCLES...
Страница 30: ...E OPERATOR MANUAL 8695 4496 B E 26 FLEXCUT 125 CE INSTALLATION...
Страница 38: ...F MAINTENANCE 8695 4496 B F 34 FLEXCUT 125 CE INSTALLATION 6 1 MAIN PARTS...
Страница 43: ...8695 4496 B F MAINTENANCE FLEXCUT 125 CE INSTALLATION F 39...