background image

6

  

(18)

1 . 

DISPOSIZIONI GENERALI E GESTIONE DEL CANTIERE

1 .1 .  DISPOSIZIONI GENERALI

IM.TEC.074.EN_rev.1.2

   - February 2022

All rights reserved

EN

DomoFlex

 - Screw-driven lifting platform

MAINTENANCE INSTRUCTIONS

2 x

MAX 50 kg

> 50 kg

IMPORTANT!

For more informa� on on safety, liability and warranty condi� ons, receipt and storage of material 

on site, packaging, waste disposal, cleaning and storage of the product; refer to the "

SAFETY IN-

STRUCTIONS AND SITE MANAGEMENT

" manual.

NOTICE

PRELIMINARY CHECKS:

 Once the packaging has been opened, check that the product is intact and has not been 

damaged during transport. Should any anomalies or damage be found, please dispatch them in writi ng on the transport 

document to the transport company, giving writt en noti ce to LIFTINGITALIA S.r.l.

 CAUTION

SAFETY AND SITE MANAGEMENT - OVERALL DISPOSITIONS:

 

1. 

Always secure tools and any objects against falling;

2. 

Pay the utmost att enti on to all the steps described in this;

3. 

While assembling the parts making up the system or aft er installati on, be careful of any sharp burrs (machining 

residues);

• 

Before proceeding with the installati on, it is necessary to remove any rubble and material deposited during the 

constructi on of the shaft .

• 

Only nuts and bolts included in the supply must be used.

• 

The bags containing the screws must be opened in correspondence with the respecti ve operati ng phases indicated in 

this manual.

• 

The instructi ons described in this manual refer to a reinforced shaft ,  to a fastening with mechanical expansion plugs 

of the stud type. For the use of  plugs in masonry other than the reinforced concrete see the att achment to this 

manual. For the shaft s with metal framework, we proceed by replacing the plugs with normal screws.

• 

In these instructi ons and on the wiring diagram, the stops are indicated with 0, 1, (2, 3 etc.), meaning "0" the lowest stop: 

the numbers on the push-butt on panels may be diff erent according to the user's needs (for example - 1, 0, etc.).

The assembly must be 

performed by a MINIMUM 2 

people;

If the load is greater than 50kg, use the hoist

for handling.

NOTE: 

In this manual, we will talk about "SHAFT" meaning for it the base slab, the slab of landing and the ver� cal wall 

that connects its slabs.

GENERAL REQUIREMENTS AND INSTALLATION SITE MANAGEMENT

GENERAL REQUIREMENTS

 WARNING

RISK OF ELECTROCUTION:

 

The lighting and power supply systems must meet the requirements of the system and the 

regulations in force. Check that it has an effective earth. 

If they do not meet all the requirements, 

interrupt the installation until the system has been brought up to standard 

by the customer.

Содержание DomoFlex

Страница 1: ...oro 16 43058 Bogolese Sorbolo PR Italy Phone 39 0521 695311 Fax 39 0521 695313 www li ingitalia com info li ingitalia com 1 18 EN IM TEC 074 EN_rev 1 2 February 2022 example DomoFlex Screw driven lifting platform MAINTENANCE INSTRUCTIONS ...

Страница 2: ...22 All rights reserved EN DomoFlex Screw driven lifting platform MAINTENANCE INSTRUCTIONS 1 3 Update p 11 22 02 2022 1 2 General update 10 01 2020 1 1 General update 01 05 2019 1 Checks updated door maintenance added 06 09 2017 Rev Description Date ...

Страница 3: ...ELIMINARY CONTROLS 7 2 1 PRELIMINARY SAFETY CHEKS 7 2 2 PRELIMINARY CHECKS OF THE INSTALLATION SITE 7 2 3 OBLIGATIONS OF THE INSTALLER 7 3 EQUIPMENT AND MATERIALS REQUIRED FOR MAINTENANCE 8 4 TEST PROCEDURE 9 4 1 GENERAL INFORMATION 9 4 2 OUT OF SERVICE MODE 9 5 MAINTENANCE OPERATIONS 10 5 1 IN FRONT OF THE CONTROL BOARD 10 5 2 IN THE PIT 11 5 3 INSIDE THE CAR 12 5 4 MAINTENANCE OPERATIONS FREQUEN...

Страница 4: ... cause death or serious personal injury CAUTION The symbol indicates that failure to observe the relevant safety measures can cause minor or moderate personal injury or damage to the device NOTICE It is not a symbol of security It indicates that the failure to comply with relevant safety measures can result in property damage INFORMATION It is not a symbol of security It indicates important inform...

Страница 5: ...is manual any divergence from the prescribed procedure may affect the operation and safety of the system and cause the immediate cancellation of the warranty Any modification or variation made to the project and the to the assembly Instructions must be documented in detail and referred to LIFTING ITALIA S r l in order to allow the company an adequate assessment Under no circumstances can a modified s...

Страница 6: ...ion of the shaft Only nuts and bolts included in the supply must be used The bags containing the screws must be opened in correspondence with the respective operating phases indicated in this manual The instructions described in this manual refer to a reinforced shaft to a fastening with mechanical expansion plugs of the stud type For the use of plugs in masonry other than the reinforced concrete ...

Страница 7: ...te ventilation for the smoke exhaust BEFORE STARTING THE INSTALLATION YOU NEED TO Arrange a material deposit area near the work area easily accessible and protected from the bad weather Prepare any lifting equipment to be used Check the presence of all materials using the list Check the state of all materials at the time of receipt on site and in case of damage or missing contact the supplier imme...

Страница 8: ... HAMMER DIGITAL MULTIMETER PORTABLE LAMP INSULATION TAPE RUBBER HAMMER SCISSORS FOR ELETTRICIANS PLIERS WRENCH BALL POINT LONG HEX KEY WRENCH STEPLESS RATCHET SPANNER SOCKET WRENCH SPANNER FLAT BLADE SCREWDRIVER PHILIPS SCREWDRIVER CORDLESS SCREWDRIVER DRILL CONCRETE DRILL BITS STEE DRILL BITS PLATFORM OR FOLDABLE SAFETY LADDER 5 STEPS 2X SIZE CHRONOMETER NOTICE The lift maintenance operations mus...

Страница 9: ...fied immediately a The stops are indicated as 0 1 2 3 0 meaning the lowest floor the COP numbering may be different according to the custo mer s needs example 1 0 etc b The other reference documents are as follows Project drawings referred to the lift Electrical schemes an instructions Hydraulic scheme c For threaded fixings coupling please respect the below table All the screws used for the lift ...

Страница 10: ...ponents from the supplier LIFTINGITALIA S r l The following maintenance areas have been identified 1 IN FRONT OF THE CONTROL BOARD 2 IN THE PIT 3 ON THE PLATFORM CAR The following table shows the maintenance areas in connection with paragraph 5 4 Maintenance area N of operation In front of the electrical panel 2 5 8 10 In the pit 6 7 10 12 13 14 On the platform car 1 2 3 4 6 7 9 10 11 12 13 14 15 ...

Страница 11: ...E LANDING FLOOR red led on the door of the control panel OFF In this way the Safe Pit device can be easily enabled 2 open the landing door using the unblocking key 3 as soon as the landing door has been unblocked a light and sound emergency signal will be enabled to remind the maintenance operator of the Safe Pit device to be activated utilized a special lever 4 In the event of an electric lock re...

Страница 12: ...e that the lift cannot be commanded from the control board remove the service panel unscrewing the safety screws put the service panel aside effect the necessary operations on the safety brakes re position the service panel and fix it with the safety screws unblock the STOP button in the car close the Mains Supply Switch and check the correct functioning of the lift WORKING ON THE BACK SIDE OF THE...

Страница 13: ...gency lighting and forced descent to the lowest floor are concerned A bring the car to the upper floor B switchthepoweroffbyopeningthepowersupplyswitchupstreamoftheelectricalpanel main of the building C car emergency light will be enabled D push the alarm button the siren will be activated E pressandholdanycallbutton thecarwilldescendandstopattheloweststoplevel thenthe door can be opened sliding d...

Страница 14: ...cy device works A open the Driving Force main switch located on the Power Supply board B with the platform stationary at the upper floor press the DOWN EMERGENCY button C openthedoorusingtheemergencykeyandchecktheplatformlowering closethedoor 6 GUIDE RAIL SHOES The play of the shoes must be 1 2 mm Major gaps can be made up for by means of shoe bearers adjustment ortogonal gaps require shoe replace...

Страница 15: ... lines either fixed and mobile 2 14 SHAFT CONTACTS Check the integrity of the following contacts doorlock block exclusion and floor levelling 2 15 PLATES SCHEMES Verify the presence of the followings schemes and plates A pit plate danger in case of access safety devices required B car roof plate not bearing surface C control board plate electrical hazard access forbidden D control board plate besi...

Страница 16: ...HE FINAL STROKE which are usually performed using special screws ARE IMPORTANT both to adapt perfectly the action of the door closer to the weight of the door on which it is applied and to ensure effective operation in all seasons The viscosity of the internal oil actually changes in relation to the external temperature THE ACTION OF THE DOOR CLOSER IS THEREFORE SUBJECT TO NATURAL SEASONAL VARIATI...

Страница 17: ...to the landing Upon the operatin completed make sure that all the landing doors are locked and blocked The car roof is NOT BEARING Do not step on the roof nor on its edge Usually a damaged frame especially if the damage was caused by a bending excessive heat etc cannot be replaced The damaged parts must be replaced Only spare parts by LIFTINGITALIA S r l can be used for replacement The repair oper...

Страница 18: ...18 18 IM TEC 074 EN_rev 1 2 February 2022 All rights reserved EN DomoFlex Screw driven lifting platform MAINTENANCE INSTRUCTIONS ...

Отзывы: