13
(18)
5 .5 . DESCRIZIONE E PERIODICITÁ DELLE OPERAZIONI DI MANUTENZIONE
IM.TEC.074.EN_rev.1.2
- February 2022
All rights reserved
EN
DomoFlex
- Screw-driven lifting platform
MAINTENANCE INSTRUCTIONS
1 . CAR MOVEMENT
Check the correct car movement and stops using the related commands.
A.
from the car: try to send the lift to each of the stops (both during ascent and descent),
checking the correct automatic stop, with the maximum difference in height of 10 mm
above or under the landing level;
B.
from all the landings: try to call the lift, checking the correct automatic stop and the “busy”
and “present” lights functioning;
C.
make sure that the lift cannot be commanded from the COP without the enabling key.
•
•
2 .
EMERGENCY POWER SUPPLY
Check the efficiency of the emergency power supply unit, as far as alarm, car emergency
lighting and forced descent to the lowest floor are concerned.
A.
bring the car to the upper floor;
B.
switch the power off by opening the power supply switch upstream of the electrical panel
(main of the building);
C.
car emergency light will be enabled;
D.
push the alarm button: the siren will be activated;
E.
press and hold any call button: the car will descend and stop at the lowest stop level, then the
door can be opened (sliding doors open automatically).
For battery replacement (batteries inside the control board) follow the below instructions.
F.
open the Driving Force switch;
G.
disconnect the battey connectors, trying to avoit shorts;
H.
replace batteries and re-connect the connectors;
I.
close the Driving Force Switch, disable the control board lighting and repeat test operations
from A. to E.;
J.
dispose of the exhausted batteries bringing them to the authorized points (as special and
dangerous waste).
•
•
OPERATION
RECOMMENDED FREQUENCY
1st run
every
6 months
every 1/2
year(s)
every
5/10 years
MAINTENANCE OPERATIONS : FREQUENCY AND DESCRIPTION