Ducting
The duct sizing for the furnace section can be determined
using HRAI Residential Air System Design Manual,
SMACNA, or any other industry-recognized manuals.
Note: "Combo units" normally deliver air at approx.
110°F (43°C), and therefore may require larger than
normal ductwork. When installing the Clean Air Furnace
as a replacement unit on a retrofit application, always
calculate the size of duct that is there.
Any ductwork running through unconditioned space must
be sealed properly and insulated to prevent heat loss. All
local codes must be followed in determining the amount of
insulation needed.
The ventilation section consists of two 6" (15.2cm) round
ports located on the side of the cabinet, which vent to the
outside. Insulated ducting with a vapor barrier such as flex-
ducting, or ridged pipe wrapped in pipe sleeve, is required
to prevent condensation from occurring on the pipe. Also
the airflow in these lines is designed to be
balanced. (See "Balancing Airflows" in this manual, for
damper location and procedure).
16
Option 2 - Downflow Models
Remove circular
metal knockout
Ventilation Ports Off Left
Ventilation Ports Off Right
Installation
A Backdraft Damper is required in the exhaust
air duct to prevent cold air from entering the
unit when the Clean Air Furnace is not running.
WARNING
The 99-CAF-BESKIT is not compatible
with horizontal models.
ATTENTION
Remove
styrofoam
knockout
Remove
styrofoam
knockout
R
Remove
styrofoam
knockout
Remove
styrofoam
knockout
Do not remove lower styrofoam knockout when
installing the optional Bathroom Exhaust System
(Part 99-CAF-BESKIT). Refer to instructions with kit.
ATTENTION
Option 3 - Horizontal Models
Содержание CAF-D-L4A-36-P16
Страница 41: ...41...