Introduction
Overview of the Clean Air Furnace ..................................3
Description and Purpose
Operation Heating/Cooling...............................................4
The Recovery Core ...........................................................5
Combo System Basic Principles.......................................6
Plumbing......................................................................7-14
Installation .................................................................15-17
Pitot Tube Air Flow Balancing..................................18-19
Function and Controls ...............................................20-21
Optional Dehumidistat
Optional Timers ..............................................................22
Wiring the Controls.........................................................23
Aircom Relays ................................................................24
Start-up Procedure ..........................................................25
Service and Maintenance................................................26
Troubleshooting ..............................................................27
Controlling your HRV
How the Dehumidistat Works.........................................28
Model Number Nomenclature Breakdown.....................29
Specifications ............................................................30-39
System Commissioning ..................................................40
Work Sheets...............................................................41-42
Wiring Diagrams .......................................................43-44
Never install an HRV/ERV in a situation
where its normal operation, lack of operation
or partial failure may result in the
backdrafting or improper functioning of
vented combustion equipment!
CAUTION
Assess how the operation of an HRV/ERV
may interact with already installed vented
combustion equipment (ie. Gas Furnaces,
Oil Furnaces, Wood Stoves, etc.).
CAUTION
Table of Contents
2
The Clean Air Furnace hydronic coil is not to
be used for chilled water applications where
condensation is expected.
ATTENTION
Air Condition coil freezing can damage the
hydronic coil of the Clean Air Furnace.
Install a Freeze Thermostat Kit to your air
conditioning coil to prevent coil freeze up.
Check with your air conditioner distributor to
obtain a Freeze Thermostat Kit.
ATTENTION
Do not apply electrical power to the unit until
installation has been fully completed (including
low voltage control wiring).
Installing Contractor
Telephone / Contact
Serial Number
Installation Date
Model
TO BE COMPLETED BY CONTRACTOR AFTER INSTALLATION
Register for your warranty at www.lifebreath.com
Airia will require the Model and Serial Number to register the unit.
Содержание CAF-D-L4A-36-P16
Страница 41: ...41...