Piping Connections and Piping Access Points
26
7.8
Insulation
To minimize the possibility of condensation, insulate all piping between the XDO and the XDP or
XDC.
7.9
Charging with Refrigerant and Starting the XD System
The Liebert XD System must be completely installed before it is charged with refrigerant. After
installation is complete, refer to the Liebert XDP or Liebert XDC user manual for instructions on
charging the XDV/XDO with refrigerant and starting the system. The complete XD system includes
all XDO and XDV units, an XDC
or
XDP unit and any other connected equipment.
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html