Checklist for Proper Installation
28
9.0
C
HECKLIST
FOR
P
ROPER
I
NSTALLATION
___ 1. Threaded rods installed in the overhead building structure.
___ 2. XDO module secured on threaded rod using mounting hardware provided. See
and
.
___ 3. XDO module level within 1/2".
___ 4. High voltage wiring to XDO module.
___ 5. Low voltage wiring to XDO.
___ 6. Piping from XDP/XDC to XDO, with isolation valves piped to each XDO.
___ 7. Field piping has no leaks.
___ 8. Piping insulated.
___ 9. Fan tray closed and securely latched.
___ 10. Start system to ensure proper operation.
___ 11. Shut down system.