Installation
2
2.0
I
NSTALLATION
2.1
References
This document must be used together with site-specific documentation and documentation for other
parts of the system.
2.2
Pre-Installation Checks
1. Verify that the XDO unit voltage matches the available utility power. The nameplate with this
information is on the bottom of the cooling module, near the fan.
2. Check the received materials to be sure all required assemblies and parts have been received. If
you discover any external damage, report them to the shipping company and your local Liebert
representative.
3. When unpacking and handling the XDO module, extra care should be taken to prevent damage to
the coils.
2.3
Parts Included With XDO
• Installation manual (this document)
• XDO module
• Mounting kit parts with the following items:
2.3.1 Optional Items
• Lighting units
• External mounting kit
Part
Qty
Qty
Required
3/8" hex nuts:
16
8
3/8" small washers: 4
4
rubber bushings:
8
8
metal sleeves:
8
4
3/8" large washers: 4
4
3/8" Nylok nuts:
4
4
Part
Qty
external mounting brackets 2
1/4-20 x 3/4 bolts
6
1/4-20 Nylok nuts:
6
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html