
Installation Drawings
27
Figure 14 Electrical field connections drawing: 100 – 250 amp Liebert STS2 with single output breaker
PS212100
Rev. 3
FRONT VIEW
1. ALL DIMENSIONS ARE IN INCHES AND (MILLIMETERS).
NOTES:
(WITH FRONT PANELS REMOVED)
SECTION A-A
NEUTRAL BUS
SOURCE 1 INPUT Ø B
SOURCE 1 INPUT Ø C
CB4
SIDE VIEW
ONE-LINE DIAGRAM
K3
K2
CB3
CB4
SYSTEM OUTPUT
K1
CB1
SOURCE 1
CB5
K1
K3
K2
CB2
SOURCE 2
.51 DIA.
GROUND BUS
FRONT VIEW
PEM NUT
RIGHT SIDE VIEW
NEUTRAL BUS
PEM NUT
RIGHT SIDE VIEW
INPUT/OUTPUT BUS
5. ALL WIRING IS TO BE IN ACCORDANCE WITH NATIONAL
4.
ALUMINUM
AND COPPER CLAD ALUMINUM CABLES AR
E
3. CONTROL WIRING AND POWER WIRING MUST BE RUN
2. TOP AND BOTTOM CABLE ENTRY AVAILABLE THROUGH
AND LOCAL ELECTRICAL CODES.
NOT
RECOMMENDED.
RUN IN A SEPARATE CONDUIT FROM INPUT CABLES.
IN SEPARATE CONDUIT. OUTPUT CABLES SHOULD BE
CONDUIT SIZE, AND REPLACE.
REMOVABLE ACCESS PLATES. REMOVE, PUNCH TO SUIT
GROUND
BUS
SOURCE 1 INPUT
Ø A, Ø
B, Ø C
SOURCE 2 INPUT
Ø A, Ø B, Ø C
SYSTEM OUTPUT
Ø A, Ø B, Ø C
NEUTRAL
BUS
SOURCE 1 INPUT Ø A
FRONT
CB1
C
B2
CB5
CB3
NEUTRAL, AND GROUND CABLE CONNECTIONS. KIT
6. HARDWARE KIT IS SUPPLIED FOR INPUT, OUTPUT,
INCLUDES 1/2" BOLTS, WASHERS, AND NUTS FOR CONNECTING
CABLES TO THE BUS BARS.
7. THE TORQUE REQUIREMENT FOR 1/2"-13 PEM NUTS IS 428 INCH-LBS. (48 N-m).
Содержание STS2
Страница 2: ......
Страница 27: ...Installation Drawings 19 Figure 6 Outline drawing 400 600 amp Liebert STS2 PS211400 Rev 02...
Страница 28: ...Installation Drawings 20 Figure 7 Outline drawing 800 1000 amp Liebert STS2 PS211800 Rev 02...
Страница 149: ...Maintenance 141 Channel 8 Channel 9 Channel 10 PRB Notes...
Страница 151: ......