6.11 Input Junction Boxes and Cables
Two input power junction boxes and interconnecting cables provide under floor connection for the two
input power feeds. Power terminal blocks are provided in each junction box for the connection of the
input power conductors and a parity-sized ground conductor. The junction boxes are NEMA 1 enclo-
sures. A main input cable assembly is provided for connection between the unit and the junction box.
The cable length between the unit and junction box is 10 feet (3 meters) long.
See
5.2 - Input Junction Box Installation—Optional
on page 10 for more information and specifi-
cations. See
Figure 29
for wiring details.
6.12 Seismic Floor Anchors
Seismic anchors are available for anchoring the unit to a concrete floor to meet seismic Zone 4
requirements. See
4.1 - Leveling and Anchoring the Unit to the Floor
on page 8 for more infor-
mation. Installation details are provided in
Figures 11
through
Figure 13
on page 26.
6.13 Seismic Floor Stand
Seismic floor stands in four heights—18", 24", 30" and 36" (457mm, 610mm, 762mm and 914mm)—
are available for the Liebert STS2. The stands can be fastened to the floor to meet seismic Zone 4
requirements. See
4.0 - Locating the Liebert STS2
and
Figures 32
through
43
for instructions and
details for installing seismic floor stands.
Содержание STS2
Страница 2: ......
Страница 27: ...Installation Drawings 19 Figure 6 Outline drawing 400 600 amp Liebert STS2 PS211400 Rev 02...
Страница 28: ...Installation Drawings 20 Figure 7 Outline drawing 800 1000 amp Liebert STS2 PS211800 Rev 02...
Страница 149: ...Maintenance 141 Channel 8 Channel 9 Channel 10 PRB Notes...
Страница 151: ......