Part 4 Trouble Shooting
- 78 -
Copyright © 2019 - 2020 LG Electronics Inc.
All rights reserved. Only training and service purposes.
IPM Check Point
Division
2 kW
Purpose
Judgment of the IPM part fault of
PCB assembly.
Items for checking
1. Judgment of damage of IGBT
2. Checking the soldering state
■
IPM Check Point
[IPM Pin Arrangement and Pin Numbers]
Step
Flow of Inspection
1
Turn the power off (wait until the outdoor device LED is turned off)
2
Remove compressor wires.
3
Measure the voltage as shown in the figure.
4
Check the voltage for being in the range of 0.3~0.5V
5
Judge IPM Pins for short.
27890W0X0Y