4
INSTALLATION METHOD
ENGLISH
Using 65mm clamp cords, fasten the relay output cable as below.
①
Separate front panel from outdoor unit.
②
Separate front cover of control box.
③
Assemble IO Module and bracket.
④
Connect the connection wires according to the instructions. (Please refer to Setting and Using Method)
+
UXB
CAUTION
Be sure to turn off outdoor unit power
before installation.
!
Main board con-
nector
(1) MFL67888703 (영영) 2017. 5. 31. 영영 6:51 Page 4