NAME OF EACH PART
3
ENGLISH
Be sure to turn off outdoor unit power
before installation.
CAUTION
!
ڸ
ڹ
ں
ڻ
ڼ
ڽ
ۀ
ڿ
ھ
NAME OF EACH PART
①
Main connector : Power input and
communication connector with
Outdoor unit
②
SW104 : Rotary Switch for setting
Demand control step
③
Digital Output : Operating & Error sta-
tus Relay output (250V, 1A)
④
SW102 : Switch for setting internal
function
⑤
Digital Input : Dry contact input
⑥
Analog Input : DC 0 ~ 10 V Analog
signal input
⑦
Analog Output : DC 0 ~ 10 V Analog
signal output
⑧
SW103 : Reset Switch
⑨
SW101 : Dip Switch for setting operat-
ing function
①
Separate front panel from outdoor unit.
②
Separate front cover of control box.
③
Assemble IO Module and bracket.
④
Fix the bracket on designated location with
two clamp cords(105mm).
⑤
Connect the connection wires according to the
instructions. (Please refer to Setting and Using
Method)
INSTALLATION
METHOD
ڸ
ڹ
UX3
ں
ڻ
+
+
ڼ
Main board connector
⑥
Fix and fasten components and cables.
⑦
Perform the switch setting according to the
instructions.
Using 105mm clamp cords, fasten the core as
below.
(1) MFL67888703 (영영) 2017. 5. 31. 영영 6:51 Page 3