48
PRDCAM
AHU Communication Kit Installation Manual
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
EEV KIT INSTALLATION
7-1/2 inches
Ø1/4”
13-5/16 inches
Mounting the PRLK048A0/
PRLK096A0 EEV Kit
1. Remove the Top Panel by unscrewing the screws
at the four (4) corners.
2. Using the Bottom Panel as a template, mark the
location on the wall or ceiling where the holes
for the screws should be placed. Drill the four (4)
holes.
3. Attach the EEV Bottom Panel securely using four
(4) field-supplied 1/4 inch long screws.
Figure 20: Removing the Screws.
Figure 21: EEV Bottom Panel
Hole Dimensions.
Mounting the EEV Kit
Mounting the PRLK396A0 / PRLK594A0 EEV Kit
1. Remove the two screws
from the EEV kit base plate
3. Remove the four screws
from the cover plate
4. Remove the cover plate
5. Drill holes in the correct locations
and use 4 field-provided screws
to secure the EEV kit.
Model
length (inch)
A
B
PRLK396A0 10-3/4 7-1/2
2. Remove the base plate.
A
Pipe diameter 5/8”
B
Hole
size
1/4”
Pipe diameter 5/8”
PRLK594A0 10-3/4 7-1/2