26
MUL
TI V S System Installation Manual
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
([DPSOHVRI6XSSRUWV
Bolt
1.5t
Plate
Insulation
Bolt
PVC
PVC
Figure 34: U-Bolt Support with Insulation.
Figure 35: O-Ring Support with Insulation.
To prevent
insulation from
pressing and
lagging, use a cover.
Sheathing
Sheathing
O-Ring
Band
Lags
Do not compress the insulation with the saddle-type support. If the insulation is compressed, it may tear open and allow condensation to
generate during product operation.
Weldin g
Refrigerant Pipe
Insulated
Support Band
Insulated
Support Band
Down Stop
Weldin g
Plate Nut
Hexagonal Nut
O-ring Ba nd
Support at Intervals Between 5 and 6-3/4 Feet
Figure 36: Saddle-Type Support.
Figure 37: U-Bolt Support with an Insulated Pipe.
Figure 38: O-Ring Band Support with an Insulated Pipe.
Figure 39: One-Point Down-Stop Support (>441 lbs.).
Figure 40: Two-Point Down-Stop Support.
GENERAL INSTALLATION GUIDELINES
Piping Preparation