4. Trouble Shooting
- 88 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Check Point
1. Check the CN_(L),CN_(N) Connection condition at the Inverter PCB.(Refer to outdoor wiring diagram)
2. Check the DC Link voltage at not operating(280V
↑
)
3. Check the DC Link voltage at Comp operating(340V
↑
)
4. Check DC Link Sensing Signal : 2.4~2.8V (Refer the Picture)
Vdc
< Main PCB>
<DC Link Voltage Check Point>
<DC_LINK Sensing Check Point>
< Input Power Source Check Point >
27/30/40k
Vdc
Содержание Multi-Inverter Type
Страница 123: ...P NO MFL36552501 APRIL 2008 ...