6.6 Power Supply and Wiring
The unit is completely wired internally at the factory
according to general rule of electrical technology, but
local rules, if they are required, should be complied
with.
1) Power supply
Power source must fulfill the following conditions:
¤
The working voltage should be higher than 90%
and lower than 110% of the rated voltage marked
on the name plate.
¤Ł
The working voltage among the three phases
should be balanced with in a 3% deviation from
each phase voltage.
¤Ø
The starting voltage should be higher than 85% of
the rated voltage marked on the name plate.
2) Wiring
After the confirmation of the above conditions,
prepare the wiring as follows:
¤
Never fail to have an individual power specialized
for the air conditioner. As for the method of wiring,
be guided by the circuit diagram pasted on the
inside of control box cover.
¤Ł
Provide a circuit brake switch between power
source and the unit.
¤Ø
The screws which fasten the wiring in the casing of
electrical fittings are liable to come loose from
vibrations to which the unit is subjected during the
course of transportation. Check them and make
sure that they are all tightly fastened.
(If they are loose, it could give rise to burn-out of
the wires.)
¤Œ
Specification of power source.
¤º
Confirm that electrical capacity is sufficient.
¤
See to that the starting voltaged is maintained at
more than 90 percent of the rated voltage marked
on the name plate.
¤
Confirm that the cable thickness is as specified in
the power sources specification.
(Particularly note the relation between cable length
and thickness.)
¤
Never fail to equip a leakage brake where it is wet
or moist.
¤
The following troubles would be caused by voltage
drop-down.
• Vibration of a magnetic switch, damage on the
contact point there of, fuse breaking, disturbance to
the normal function of a overload protection device.
• Proper starting power is not given to the compressor.
3) Earthing work
Connect the cable of diameter 1.6mm or more to the
earthing terminal provided in the control box and do
earthing. In case of equipping the electrical resis-
tance will be reduced to 500
Ω
. But in case that no
earthing is required in particular, the electrical resis-
tance between the med is below 100
Ω
.
Also, the unit can be earthed to the water service
pipe buried under the ground where electrical resis-
tance of 3
Ω
or less is retained. Of course, the earth-
ing to pipes must be approved by the authority of
water supply.
– 32 –
Voltage
Time
Starting point
Power soure voltage
working voltage
Starting voltage
Earthing
Earthing
Indoor
Outdoor
Knife Switch
Main cables
Leakage
brake
Содержание LP-E5020CL
Страница 12: ... 12 3 LP E5020CL LP E5022CL CA WIRING DIAGRAM ...
Страница 13: ... 13 4 LP E5022HL HA ...
Страница 66: ... 66 10 ELECTRONIC CONTROL DEVICE 10 1 MAIN P C B ASM ...
Страница 68: ... 68 11 1 Circuit and Troubleshooting 11 SCHEMATIC DIAGRAM ...
Страница 71: ... 71 6 51 49 47 44 50 14 11 11 1 12 10 10 1 8 9 9 1 9 2 46 42 40 48 5 6 7 49 45 55 43 1 ...
Страница 79: ...P NO 3828A30074N Printed in Korea ...