6.9 Final Check and Test Run
After installing the unit, perform the final check and run-
ning test as follows:
¤
Is the unit securely mounted?
¤Ł
Is the installation location adequate?
¤Ø
Is the water piping work adequately and without
leakage?
¤Œ
Are trapped drain lines installed at condensate
drain connections?
¤º
Has the refrigeration cooling cycle been kept
sealed?
¤
Is the electrical wiring adequate and are the screws
tightened on terminals?
After the above final checkings, prepare the running
test as follows:
¤
Connect compound gauges to the check joints at
discharge and suction sides of the compressor.
¤Ł
Turn all switches "OFF"
¤Ø
Turn the main switch "ON"
Running test should be accomplished as follows:
¤
Set operation switch at "FAN" and the fan will start.
Check to ensure that the fan sounds normal.
¤Ł
Next, set it at "COOL" and the compressor will
start. Check to ensure that the compressor sounds
normal.
¤Ø
Check discharge and suction pressure on the com-
pound gauges.
¤Œ
Check working voltage, phase balance and running
current.
¤º
Check to ensure that the thermistor functions prop-
erly.
¤
Check to ensure that the high pressure control
switch functions correctly.
– 37 –
Содержание LP-E5020CL
Страница 12: ... 12 3 LP E5020CL LP E5022CL CA WIRING DIAGRAM ...
Страница 13: ... 13 4 LP E5022HL HA ...
Страница 66: ... 66 10 ELECTRONIC CONTROL DEVICE 10 1 MAIN P C B ASM ...
Страница 68: ... 68 11 1 Circuit and Troubleshooting 11 SCHEMATIC DIAGRAM ...
Страница 71: ... 71 6 51 49 47 44 50 14 11 11 1 12 10 10 1 8 9 9 1 9 2 46 42 40 48 5 6 7 49 45 55 43 1 ...
Страница 79: ...P NO 3828A30074N Printed in Korea ...