7-3. Evacuation
(All amount of refrigerant leaked)
• Procedure
①
Connect the vacuum pump to the center hose of charge set.
②
Evacuation for approximately one hour.
- Confirm that the gauge needle has moved toward -76cmHg (vacuum of 4 mmHg or less).
③
Close the valve (Lo side) on the charge set, turn off the vacuum pump, and confirm that the gauge needle
does not move (approximately 5 minutes after turning off the vacuum pump).
④
Disconnect the charge hose from the vacuum pump.
- Vacuum pump oil.
If the vacuum pump oil gets dirty or depleted, replenish as needed.
CLOSE
Lo
OPEN
Vacuum pump
Gas side
Liquid side
Indoor unit
Outdoor unit
Open
3-Way
valve
Open
3-Way
valve
–29–
Содержание LP-8091PC
Страница 1: ...Package Air Conditioner SERVICE MANUAL MODEL LP 8091PC Библиотека СОК ...
Страница 42: ...9 Electronic Control Device 42 9 1 MAIN P C B ASSY ...
Страница 44: ...10 Schematic Diagram 44 Circuit and Troubleshooting ...
Страница 46: ... 46 14 17 10 19 29 1 13 11 8 1 15 12 8 9 20 22 5 6 7 2 4 3 2 1 16 ...
Страница 49: ... 49 Outdoor Unit 4 1 4 2 4 4 4 3 12 8 ...
Страница 52: ...P No 3828A30074W April 2000 Printed in Korea ...