2) Balance refrigerant of the 3-way(liquid side), 3-way(gas side) valves
(Gas leakage)
• Procedure
①
Confirm that both the liquid side and gas side valves are set to the back seat.
②
Connect the charge set to the 3-way(gas side) valve's port.
• Leave the valve on the charge set closed.
• Connect the charge hose with the push pin to the service port.
③
Open the valve (Lo side) on the charge set and discharge the refrigerant until the gauge indicates 0 kg/cm
2
g.
- If there is no air in the refrigerant cycle (the pressure when the air conditioner is not running is higher than 1
kg/cm
2
g), discharge the refrigerant until the gauge indicates 0.5 to 1 kg/cm
2
g. In case of this, it will not be
necessary to apply an evacuation.
- Discharge the refrigerant gradually; if it is discharged too suddenly, the refrigeration oil will also be discharged.
CLOSE
OPEN
Gas side
Liquid side
Indoor unit
Outdoor unit
Open
Open
3-Way
valve
3-Way
valve
–28–
Содержание LP-8091PC
Страница 1: ...Package Air Conditioner SERVICE MANUAL MODEL LP 8091PC Библиотека СОК ...
Страница 42: ...9 Electronic Control Device 42 9 1 MAIN P C B ASSY ...
Страница 44: ...10 Schematic Diagram 44 Circuit and Troubleshooting ...
Страница 46: ... 46 14 17 10 19 29 1 13 11 8 1 15 12 8 9 20 22 5 6 7 2 4 3 2 1 16 ...
Страница 49: ... 49 Outdoor Unit 4 1 4 2 4 4 4 3 12 8 ...
Страница 52: ...P No 3828A30074W April 2000 Printed in Korea ...