1) Re-airpurging
(Re-installation)
• Procedure
①
Confirm that both the 3-way (liquid side) valve
and the 3-way(gas side) valve are set to the
closed position.
②
Connect the charge set and a gas cylinder to the
service port of the 3-way(gas side) valve.
• Leave the valve on the gas cylinder closed.
③
Air purging.
• Open the valves on the gas cylinder and the
charge set. Purge the air by loosening the flare
nut on the 3-way(liquid side) valve approximately
45° for 3 seconds then closing it for 1 minute;
repeat 3 times.
• After purging the air, use a torque wrench to
tighten the flare nut on liquid side valve.
④
Check gas leakage.
• Check the flare connections for gas leakage.
⑤
Discharge the refrigerant.
• Close the valve on the gas cylinder and
discharge the refrigerant until the gauge indicates
3 to 5kg/cm
2
g
⑥
Disconnect the charge set and the gas cylinder,
and set the 3-way(liquid side) and 3-way(gas side)
valves to the open position.
• Be sure to use a hexagonal wrench to operate
the valve stems.
⑦
Mount the valve stem nuts and the service port nut.
• Use torque wrench to tighten the service port nut.
• Be sure to check gas leakage.
CLOSE
OPEN
R22
Gas side
Gas cylinder
Liquid side
Indoor unit
Outdoor unit
Closed
3-Way
valve
Closed
3-Way
valve
–27–
Содержание LP-8091PC
Страница 1: ...Package Air Conditioner SERVICE MANUAL MODEL LP 8091PC Библиотека СОК ...
Страница 42: ...9 Electronic Control Device 42 9 1 MAIN P C B ASSY ...
Страница 44: ...10 Schematic Diagram 44 Circuit and Troubleshooting ...
Страница 46: ... 46 14 17 10 19 29 1 13 11 8 1 15 12 8 9 20 22 5 6 7 2 4 3 2 1 16 ...
Страница 49: ... 49 Outdoor Unit 4 1 4 2 4 4 4 3 12 8 ...
Страница 52: ...P No 3828A30074W April 2000 Printed in Korea ...