
8
TABLE OF CONTENTS
ENGLISH
Thank you for purchasing the Water Cooled Centrifugal Chiller of LG Electronics.
Installation as instructed after reading this manual will ensure the safety, convenience and long lifetime of the unit.
• Please read this manual carefully for the correct installation and proper operation of the Centrifugal Chiller unit.
• Once the installation completed, please run the commissioning and inspect according to the operating & mainte-
nance manual.
h
This manual describes safety cautions for installation, general information, carrying and installation and wiring infor-
mation of the Water Cooled Centrifugal Chiller.
3
1. CAUTIONS FOR SAFETY
_ WARNING/CAUTION
3
1-1. Warning
5
1-2. Caution
9
2. INTRODUCTION
9
2-1. General introduction
9
2-2. System structure
10
2-3. Nomenclature
10
2-4. Name plate
11
2-5. Main unit conversions
13
3. STRUCTURE OF SCREW
CHILLER
13
3-1. Chiller cycle
14
3-2. Main components of Screw chiller
22 4. CONTROL SYSTEM
22
4-1. Components of control panel and main
parts
29
4-2. Outside view of Startup panel - Stan-
dard Type
30
4-3. Basic control algorithm
31
4-4. BMS support function
32
4-5. Control screen (Product function)
34
4-6. Screw Chiller Timing Sequence –
Run & Stop
70
4-7. Product Protection Function
70
Check points before inspection
73 5. CHECK AND TROU-
BLESHOOTING
74
5-1. Check
74
Check points before inspection
74
Check items after inspection
76 6. Commissioning
76
6-1. Delivery and Installation Check
78
6-2. Preparation for Commissioning
85
6-3. Commissioning and startup
86
6-4. Startup procedure after stopping run
for a long time
87
6-5. Stop running the product
88 7. MAINTENANCE
88
7-1. Maintenance and inspection standard
91
7-2. Periodic inspection
95
7-3. Maintenance during off-season
96
7-4. Periodical maintenance table
98
7-5. Operation Inspection Table
99
7-6. Oil maintenance
100
7-7. General maintenance
104 8. TROUBLESHOOTING
104
8-1. Causes and actions for alarms
115
8-2. Chiller problems and actions
117
8-3. Actions for screw compressor status
118 9. OPERATION RECORD
CHECK
118
9-1. Operation record check list
TABLE OF CONTENTS
Содержание LCWW
Страница 119: ......