102
Outdoor Unit
2) Step 2 : PCB error check
- After 40 sec, error check begins.
- All errors of units including sub units are displayed in 7 segment.
- If communication with the inverter fan PCB and that with the inverter
compressor PCB are normal, 2 LED's on the main PCB are blink.
LED01k represents the communication state with the inverter compressor PCB.
LED02k represents the communication state with the inverter fan PCB.
3) Step 3 : Auto addressing of indoor units
- Auto addressing begins when address(red) button in Main PCB is pressed for 6 sec.
- During auto addressing, 7 segment on main PCB displays "88"
- After auto addressing, the number of indoor units is displayed in 7 segment for 30 sec. The address of each
indoor unit is displayed on each wired remote controller.
Push address(red) button for 6 sec.
Auto address starts
Auto address is in progress (max. 15 min.)
The number of indoor units is displayed for 30 sec.
(35 indoor units found)
Auto address process is finished.
Every indoor unit displays its address on
wired remote controller and the 7 segment of
main PCB is off.
1 2 3 4 5 6 7 8
(6 sec.)
Function
Содержание ARNU Series
Страница 13: ...Service Manual 13 External Appearance 2 2 Outdoor Units ARUN1008F20 10HP ...
Страница 16: ...16 ...
Страница 17: ...Service Manual 17 Indoor Units ...
Страница 18: ...18 Indoor Unit ...
Страница 30: ...30 Indoor Unit ...
Страница 44: ...44 Indoor Unit ...
Страница 79: ...Service Manual 79 Outdoor unit ...
Страница 88: ...88 Outdoor Unit 5 Wiring Diagrams Wiring Diagrams ...
Страница 112: ...112 Outdoor Unit ...
Страница 113: ...Service Manual 113 Trouble shooting guide ...
Страница 137: ...Service Manual 137 Troubleshooting Guide Resistance measure between phases of compressor ...
Страница 140: ...Troubleshooting Guide 140 Outdoor Unit Check 3 phase rectification diode Measure input power between phases R S R T S T ...
Страница 141: ...Service Manual 141 Troubleshooting Guide Measure input power of one phase R S T Connector of compressor ...
Страница 142: ...Troubleshooting Guide 142 Outdoor Unit Connector of reactor Connectors of 3phase diode ...
Страница 143: ...Service Manual 143 Troubleshooting Guide Connectors of capacitor Check IPM PCB ...
Страница 144: ...Troubleshooting Guide 144 Outdoor Unit Measure current of IPM U V W Measure voltage of IPM P N ...
Страница 149: ...Service Manual 149 Troubleshooting Guide SVC valve Measure resistance on the pressure switch connector ...
Страница 150: ...Troubleshooting Guide 150 Outdoor Unit Pressure switch CHECK VALVE ...
Страница 152: ...Troubleshooting Guide 152 Outdoor Unit Measure power input of outdoor unit ...
Страница 153: ...Service Manual 153 Troubleshooting Guide Measure power input of outdoor unit ...
Страница 156: ...Troubleshooting Guide 156 Outdoor Unit Liquid injection by pass valve ...
Страница 157: ...Service Manual 157 Troubleshooting Guide Measure resistance of LEV coil ...
Страница 158: ...Troubleshooting Guide 158 Outdoor Unit Heater ...
Страница 164: ...Troubleshooting Guide 164 Outdoor Unit Pressure sensor connector High pressure sensor Low pressure sensor ...
Страница 168: ...Troubleshooting Guide 168 Outdoor Unit Measure input power of outdoor unit ...
Страница 172: ...Troubleshooting Guide 172 Outdoor Unit Check main fuse of out door unit ...
Страница 176: ...Troubleshooting Guide 176 Outdoor Unit Fan IPM ...
Страница 178: ...Troubleshooting Guide 178 Outdoor Unit Measure input power of fan main PCB ...
Страница 182: ...Troubleshooting Guide 182 Outdoor Unit 4way valve in the outdoor unit 4way valve connector on the Main PCB ...
Страница 183: ...Service Manual 183 Exploded View Replacement Parts List ...