1
8
PRODUCT INSTALLATION
ENGLISH
Please be sure to secure two section with
5 screws. if one of screw is missing, it
could cause unbalance of product or capac-
ity degradation.
CAUTION
!
The method to rejoin the indoor unit
is as follows.
①
Sub drain pan and the fan deck section to-
gether with the 5 screws.
②
Carefully align the heat exchanger section
and fan deck section.
③
Lift the heat exchanger section about
50mm, push it forward and then back
down And screw the 5 screws the heat ex-
changer section with unit.
④
Secure the two sections together with the
5 bolts. Re-attach the side lock strap.
⑤
Re-connect the unplugged cables.
Reassemble the control box cover.
⑥
Carefully replace the fan deck section top
cover and secure the cover with the
screws.
Checking the Drainage
Checking the Drainage
* Check the drainage.
- Spray one or two glasses of water upon the
evaporator.
- Ensure that water flows drainage hose of
indoor unit without any leakage.
Lift up
1
Fan deck section
H eat exchanger
section
3
Side lock
strap
0
Fan deck section
H eat exchanger
section
Fan deck
top cover
Содержание 62AWYU7L6
Страница 57: ......