8
THERMA V
Split Type
Design and installation
6. Installation
6.1 Foundation for Installation
• Check the strength and level of the installation ground so that the unit will not cause any operating vibration
ornoise after installation.
• Fix the unit securely by means of the foundation bolts. (Prepare 4sets of M12 foundation bolts, nuts and
washerseach which are available on the market.)
• It is best to screw in the foundation bolts until their length are 20mm from the foundation surface.
WARNING
•
Be sure to remove the Pallet(Wood Support) of the bottom
side of the outdoor unit Base Pan before fixing the bolt. It
may cause the unstable state of the outdoor settlement, and
may cause freezing of the heat exchanger resulting in
abnormal operations.
•
Be sure to remove the Pallet(Wood Support) of the bottom
side of the outdoor unit before welding. Not removing
Pallet(Wood Support) causes hazard of fire during welding.
950
390
360
614
165
[Unit:mm]
Foundation bolt executing method
200
Nut
75
75
200
Spring washer
Frame
Anti-vibration
materials
Four bolt are
required
3 thread ridges
H-Beam
Concrete
base
100
[U4 Chassis]
Pallet(Wood Support)
- Remove before Installation
Содержание 5BPU0-02C
Страница 1: ...Air to Water Heat Pump Split Type R410A 50Hz 5BPU0 02D Replaces 5BPU0 02C P No MFL66101112 ...
Страница 3: ...General Information THERMA V Split Type 1 Model Line Up 2 Nomenclature ...
Страница 9: ...Indoor Unit THERMA V Split Type Hydro Box Unit DHW Tank Integrated Unit ...
Страница 17: ...8 THERMA V Split Type Hydro Box Unit 4 Wiring Diagrams AHNW16606A3 HN1616 NK3 ...
Страница 18: ...4 Wiring Diagrams 9 THERMA V Split Type Hydro Box Unit AHNW16809A3 HN1639 NK3 ...
Страница 31: ...THERMA V Split Type 4 Wiring diagrams 8 DHW Tank Integrated Unit Indoor unit Controller ...