Head
GA10218_0101 - 5/2002
⏐
27
3 First Operation
Check
The steps for an initial operation are described in this chapter. It is explai-
ned how to switch on the PhoeniXL, how to measure and how to carry out
an internal calibration.
If anything unexpected happens during the initial operation or the leak
detector acts in a strange way the PhoeniXL can be switched off by the
mains switch at any time.
3.1 Needed Equipment
The following parts will be needed:
A blind flange 25 KF (if not preassembled at the inlet port).
A helium test leak with a DN 25 KF connection (optional).
A forevacuum pump connected to the DN25 KF flange on the side or
under the bottom (dry or wet version) for use with the PhoeniXL
300
Modul
3.2 Description of the Initial Ope-
ration
Please proceed the following description step by step to start the initial
operation. Refer to Chapter
5
for a more detailed description.
3.2.1 Startup and Measure
1. Unpack the PhoeniXL and inspect it for any external damage (refer to
Chapter
1.4
).
2. Connect the instrument to the mains power (Refer to Chapter
2.2.1
).
For the PhoeniXL
300 Modul
connect the forevacuum pump and switch it
on.
3. Switch on the PhoeniXL by using the mains switch
Fig. 3
/4.
Caution
Don’t switch the PhoeniXL on when ambient temperature is
below 10°C or above 40°C.
After power on a welcoming picture appears on the screen of the control
panel
Fig. 4
/1, the status information on the speed of the turbo pump, the
foreline pressure, the emission and the active filament are given.
The start up procedure takes less than 2 minutes and the end is indicated
by a signal. The PhoeniXL is in Stand-by mode now.(
Fig. 4
)
4. Check if the inlet port is blanked off. If not, please mount a blind flange
with o-ring on the inlet port.
Содержание 250000
Страница 105: ...Head GA10218_0101 9 2002 106 Fig 4 Declaration of Conformance ...
Страница 106: ...Head 107 GA10218_0101 9 2002 ...
Страница 107: ...Head GA10218_0101 9 2002 108 ...