Table of Contents
Unpack pack(s)……………………………………………………... 1
Mount pack(s)……………………………………………….………
1
Terminate conduits…………………………………………………. 3
Convert bussing to single-phase…………………………………
3
Pull power, load and control conductors to the pack(s)………..
4
Connect power feeders…………………………………………….
4
Connect load conductors…………………………………………..
5
Low-voltage application notes…………………………………..… 5
Connect control conductors……………………………………….. 6
Seal unused openings………………………………………….….. 6
Install control module(s)……………………………………………
7
Set thumbwheel switch(es)………………………………………... 7
Set Non-dim switches………………………………………………
8
Apply power and check…………………………………………….
8
Install dimmers………………………………………………………
8
Install filler modules……………….……………….…….…………
9
Test loads……………………………………………………………
9
Close door……………………………………………………………
9
Maintenance and Specifications……………………………….…. 10
Warranty ……………………………………………………………. 11