Page
12
SYSTEM CHECKOUT
The following procedure should be followed to verify the correct installation and operation of the
Expansion Enclosure.
PRELIMINARY CHECKS
1. Carefully review the hookups to the power supply, zone inputs, and outputs. Make sure that all
wires are fully inserted into the terminal strips and that all screws on the terminal strips are
securely tightened.
2. Make sure that no one is standing by a siren or sounder that may activate unexpectedly.
3. Configure the controller for operation with the Expansion Enclosure. Set the zone types for
each of the Expansion Enclosure zone inputs. Bypass all panic, tamper, and fire zones.
POWER SUPPLY CHECKOUT
1. Disconnect the positive (red) wire to the battery. Make sure that it is not touching anything.
2. Plug in the power transformer. The AC ON LED should illuminate. The STATUS LED should
begin blinking, which indicates that the processor and software are working properly.
3. Unplug the power transformer to turn off the system. Connect the red battery wire to the
positive terminal on the battery. The system should not start.
4. Plug in the power transformer. The system should start.
5. Unplug the power transformer. The system should continue to run on the battery, as evidenced
by the flashing STATUS LED. The AC ON LED should be off. Plug the transformer back in
and secure it to the outlet.
W
EB VER
S
ION
www.
.com
1.800.561.8187
Содержание 17A00
Страница 6: ...Page 3 FIGURE 1 MODEL 17A00 HOOKUP WEB VERSION www com information itm com 1 800 561 8187 ...
Страница 10: ...Page 7 FIGURE 3 FIRE ZONE CONNECTIONS WEB VERSION www com information itm com 1 800 561 8187 ...
Страница 12: ...Page 9 FIGURE 4 RELAY MODULE CONNECTIONS WEB VERSION www com information itm com 1 800 561 8187 ...