
Safety
8
TMC 66
Leuze electronic
DEUTSCH
E
NGLISH
FRANÇAIS
IT
A
LIANO
ESPAÑOL
N
EDERLANDS
2
Safety
Before using the Test Monitoring Unit, a risk evaluation must be performed according to
valid standards (e.g. EN ISO 14121, EN ISO 12100-1, ISO 13849-1, IEC 61508,
EN 62061). The result of the risk assessment determines the required safety level of the
Test Monitoring Unit (see Tabelle 2.1-1). For mounting, operating and testing, document
"TMC 66 Test Monitoring Units with integrated muting controller" as well as all applicable
national and international standards, regulations, rules and directives must be observed.
Relevant and supplied documents must be observed, printed out and handed to the
affected personnel.
Before working with the Test Monitoring Unit, completely read and understand the
documents applicable to your task.
In particular, the following national and international legal regulations apply for the start-up,
technical inspections and work with Test Monitoring Units:
• Machinery directive 2006/42/EC
• Low voltage directive 2006/95/EC
• Electromagnetic compatibility directive 2004/108/EC
• Use of Work Equipment Directive 89/655/EEC supplemented by Directive 95/63 EC
• OSHA 1910 Subpart 0
• Safety regulations
• Accident-prevention regulations and safety rules
• Ordinance on Industrial Safety and Health and Labor Protection Act
• Device Safety Act
Notice!
For safety-related information you may also contact the local authorities (e.g., industrial
inspectorate, employer's liability insurance association, labor inspectorate, occupational
safety and health authority).
2.1
Approved purpose and foreseeable improper operation
Warning!
A running machine can cause severe injuries!
Make certain that, during all conversions, maintenance work and inspections, the system is
securely shut down and protected against being restarted again.
2.1.1
Proper use
The Test Monitoring Unit must only be used after it has been selected in accordance with
the respectively applicable instructions and relevant standards, rules and regulations
regarding labor protection and occupational safety, and after it has been installed on the
machine, connected, commissioned, and checked by a
competent person
.
When selecting the Test Monitoring Unit it must be ensured that its safety-related capability
meets or exceeds the required performance level PL
r
ascertained in the risk assessment.