6
Commissioning
6.1
Before initial switch-on
34
Lenze · E94AYCEC Communication module (POWERLINK CN) · Communication Manual · DMS 3.0 EN · 08/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6
Commissioning
During commissioning, plant-specific data such as motor parameters, operating parameters,
responses, and parameters for fieldbus communication are defined for the inverter. Lenze devices
use codes for this purpose.
The codes of the inverter and for communication are saved to the memory module in a non-volatile
data set.
In addition, there are codes for diagnosing and monitoring the stations.
6.1
Before initial switch-on
Note!
When parameterising the communication module, please note that the code number
depends on the slot of the Servo Drive 9400 into which the communication module is
plugged.
The first two digits of the code number indicate the slot:
• C
13
nnn for slot MXI1
Parameters of the communication module for slot MXI1
• C
14
nnn for slot MXI2
Parameters of the communication module for slot MXI2
Parameters of the standard device that are relevant to
.
Stop!
Before switching on the Servo Drive 9400 and the communication module for the first
time, check the entire wiring for completeness, short circuit and earth fault.