Chapter 3. Installation
Inspecting the equipment
About this task
If any equipment has been damaged during shipment, keep the shipping cartons
and packing materials and contact your place of purchase.
Note:
Check the battery recharge date on the shipping carton label. If the date has
passed and the battery packs were never recharged, do not use the UPS. Contact
your service representative.
Unpacking the unit
About this task
Important:
Unpacking the unit in a low-temperature environment might cause
condensation to occur in and on the unit. Do not install the unit until the inside
and outside of the unit are absolutely dry (hazard of electric shock).
Procedure
1.
Unpack the equipment and remove all packing materials and the shipping
carton.
Note:
Do not lift the UPS or EBM from the front panel.
Figure 8. Unpacking the UPS and Extended Battery Module
2.
Discard or recycle the packaging in a responsible manner, or store it for future
use.
© Copyright Lenovo 2015
17
Содержание RT11.0VA
Страница 1: ...6U Rack or Tower UPS RT8 0kVA and RT11 0VA and Maintenance Bypass Installation and User s Guide ...
Страница 2: ......
Страница 3: ...6U Rack or Tower UPS RT8 0kVA and RT11 0VA and Maintenance Bypass Installation and User s Guide ...
Страница 18: ...xvi Installation and User s Guide ...
Страница 22: ...4 Installation and User s Guide ...
Страница 86: ...68 Installation and User s Guide ...
Страница 98: ...80 Installation and User s Guide ...
Страница 100: ...82 Installation and User s Guide ...
Страница 101: ......
Страница 102: ...Part Number 00WA361 Printed in USA 1P P N 00WA361 ...