Always connect the ground wire first.
1.
Remove the jumper.
2.
Insert the Normal AC cable through the
cable gland.
3.
Connect the three cables to the Normal
AC source terminal blocks.
Do not
connect anything to the Bypass terminal
blocks.
4.
Insert the Output cable through the cable
gland.
5.
Connect the three cables to the Output
terminal blocks.
6.
Put back and secure the terminal blocks
cover with the screws.
7.
Tighten the cable glands.
Frequency converter connection (3Phase units)
About this task
Important:
This connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the upstream protection devices
(Normal AC source and Bypass AC source) are open "O" (off).
Always connect the ground wire first.
1.
Remove the jumper.
2.
Insert the Normal AC cable through the
cable gland.
3.
Connect the five cables (for 8PX and 9PX
models) or three cables (for KX models)
to the Normal AC source terminal blocks.
Do not connect anything to the Bypass
terminal blocks.
4.
Insert the Output cable through the cable
gland.
5.
Connect the three cables to the Output
terminal blocks.
6.
Put back and secure the terminal blocks
cover with the screws.
7.
Tighten the cable glands.
HotSwap MBP connection
Follow the instructions for your specific MBP model.
30
Installation and User's Guide
Содержание RT11.0VA
Страница 1: ...6U Rack or Tower UPS RT8 0kVA and RT11 0VA and Maintenance Bypass Installation and User s Guide ...
Страница 2: ......
Страница 3: ...6U Rack or Tower UPS RT8 0kVA and RT11 0VA and Maintenance Bypass Installation and User s Guide ...
Страница 18: ...xvi Installation and User s Guide ...
Страница 22: ...4 Installation and User s Guide ...
Страница 86: ...68 Installation and User s Guide ...
Страница 98: ...80 Installation and User s Guide ...
Страница 100: ...82 Installation and User s Guide ...
Страница 101: ......
Страница 102: ...Part Number 00WA361 Printed in USA 1P P N 00WA361 ...