background image

Page 13

Liquid Service Valve (Valve Open)

Schrader

Valve

Service Port

Service Port

Cap

Insert Hex

Wrench Here

Field Side

Unit Side

Stem Cap

Schrader Valve Open

To Line Set When Valve Is

Closed (Front Seated)

Service

Port

Service Port

Cap

Stem Cap

Insert Hex

Wrench Here

Liquid Service Valve (Valve Closed

)

(Valve Front

Seated)

 

Field Side

Unit Side

Figure 13

Vapor Line (Ball Type) Service Valve 

(Valve Open)

Figure 14

Schrader

valve

stem cap

Use Adjustable Wrench

To open:  rotate stem counter-clockwise 90°.

To close:  rotate stem clockwise 90°.

ball

(shown open)

service port

cap

service

port

field side

unit side

stem

Leak Testing

After the line set has been connected to the indoor and out-
door units, the line set connections and indoor unit must be
checked for leaks.

WARNING

Refrigerant can be harmful if it is inhaled. Refriger-
ant must be used and recovered responsibly.

Failure to follow this warning may result in personal
injury or death.

 

WARNING

Danger of explosion:  Can cause
equipment damage, injury or death.
Never use oxygen to pressurize a re-
frigeration or air conditioning system.
Oxygen will explode on contact with
oil and could cause personal injury.

WARNING

Danger of explosion:  Can cause equipment damage,
injury or death. When using a high pressure gas
such as dry nitrogen to pressurize a refrigeration or
air conditioning system, use a regulator that can
control the pressure down to 1 or 2 psig (6.9 to 13.8
kPa).

Using an Electronic Leak Detector

 1 − Connect a cylinder of R410A to the center port of the

manifold gauge set.

 2 − With both manifold valves closed, open the valve on

the R410A  cylinder (vapor only).

 3 − Open the high pressure side of the manifold to allow

the R410A  into the line set and indoor unit. Weigh in a
trace amount of R410A .

 

[A trace amount is a maximum

of 2 ounces (57 g) or 3 pounds (31 kPa) pressure.]
Close the valve on the R410A  cylinder and the valve
on the high pressure side of the manifold gauge set.
Disconnect the R410A  cylinder.

 4 − Connect a cylinder of nitrogen with a pressure regulat-

ing valve to the center port of the manifold gauge set.

 5 − Connect the manifold gauge set high pressure hose to

the vapor valve service port. 

(Normally, the high pres-

sure hose is connected to the liquid line port; however,
connecting it to the vapor port better protects the man-
ifold gauge set from high pressure damage.)

 6 − Adjust the nitrogen pressure to 150 psig (1034 kPa).

Open the valve on the high side of the manifold gauge
set which will pressurize line set and indoor unit.

Содержание HPXA15 SERIES

Страница 1: ...a qualified installer or service agency INSTALLATION INSTRUCTIONS HPXA15 SERIES UNITS HEAT PUMP UNITS 504 713M 02 04 Supersedes 12 02 Table of Contents HPXA15 Outdoor Unit 1 Shipping Packing List 1 G...

Страница 2: ...in 27 7 8 25 7 8 29 7 8 12 1 4 22 7 16 14 7 16 22 1 8 16 3 4 2 7 8 5 1 2 HPXA15 024 mm 708 657 759 311 570 367 562 425 730 140 HPXA15 030 in 30 7 8 32 1 8 34 1 16 12 3 4 26 5 8 18 5 8 28 1 8 17 1 4 3...

Страница 3: ...s 1 Place a sound absorbing material such as Isomode under the unit if it will be installed in a location or posi tion that will transmit sound or vibration to the living area or adjacent buildings 2...

Страница 4: ...y support the unit Consult local codes for rooftop applications If unit coil cannot be mounted away from prevailing winter winds a wind barrier should be constructed See figure 3 Size barrier at least...

Страница 5: ...eld wiring diagram NOTE A complete unit wiring diagram is located in side the unit control box cover 3 Install room thermostat ordered separately on an in side wall approximately in the center of the...

Страница 6: ...Corp 9351 L9 for proper size type and application of field fabricated lines Valve sizes are also listed in table 1 Refrigerant Connections HPXA15 Matched with New Indoor Coil and Line Set If an existi...

Страница 7: ...ure 9 shows how to install line sets on horizontal runs Figure 10 shows how to make a transi tion from horizontal to vertical Finally figure 11 shows how to place the outdoor unit and line set Refrige...

Страница 8: ...ire Tie Wire Tie around vapor line only Floor Joist or Roof Rafter Tape or Wire Tie Strap the vapor line to the joist or rafter at 8 ft intervals then strap the liquid line to the vapor line To hang l...

Страница 9: ...e Metal Sleeve Anchored Heavy Nylon Wire Tie Automotive Muffler Type Hanger Wall Stud Wall Stud Liquid Line Vapor Line Wrapped in Armaflex Strap Liquid Line To Vapor Line Metal Sleeve Figure 10 Outsid...

Страница 10: ...Engineering Handbook for approved TXV match ups and application information Check expansion valves equipped with Chatleff fittings are available from Lennox Refer to the Engineering Handbook for appli...

Страница 11: ...ine valve Disconnect all power to the existing outdoor unit Re fer to gauges after shutdown to confirm that the valves are not allowing refrigerant to flow back into the low side of the system Disconn...

Страница 12: ...se at up to 800 psi of pressure with a 4000 psi burst rating Service Valves Access the liquid line and vapor line service valves figures 13 and 14 and gauge ports are used for leak testing eva cuating...

Страница 13: ...al injury WARNING Danger of explosion Can cause equipment damage injury or death When using a high pressure gas such as dry nitrogen to pressurize a refrigeration or air conditioning system use a regu...

Страница 14: ...set to 150 psig 1034 kPa and purge the hose Open the manifold gauge valves to break the vacuum in the line set and indoor unit Close the manifold gauge valves WARNING Danger of Equipment Damage Avoid...

Страница 15: ...e 4 When the heating demand has been satisfied switch the thermostat to cooling mode with a set point of 68 F 20 C When pressures have stabilized use a digital thermometer to record the liquid line te...

Страница 16: ...lations Significant differences could mean that the system is not properly charged or that a problem exists with some component in the system Pressures higher than those listed indicate that the syste...

Страница 17: ...door Coil E t i Ai HPXA15 024 HPXA15 030 HPXA15 036 HPXA15 042 HPXA15 048 HPXA15 060 Entering Air Temp F C Liquid Vapor Liquid Vapor Liquid Vapor Liquid Vapor Liquid Vapor Liquid Vapor 65 18 3 252 131...

Страница 18: ...506 5 43 125 0 74 214 0 105 340 5 136 512 9 44 127 3 75 217 4 106 345 3 137 519 3 45 129 7 76 220 9 107 350 1 138 525 8 46 132 2 77 224 4 108 355 0 139 532 4 47 134 6 78 228 0 109 360 0 140 539 0 48...

Страница 19: ...t control defrost relay time delay diagnostic LEDs and a terminal strip for field wiring connections See figure 17 The control provides automatic switching from normal heating operation to defrost mod...

Страница 20: ...The service light thermostat provides a signal which activates the room ther mostat service light during periods of inefficient operation Diagnostic LEDs The defrost board uses two LEDs for diagnosti...

Страница 21: ...re lubrication is needed 3 Adjust blower speed for cooling Measure the pressure drop over the coil to determine the correct blower CFM Refer to the unit information service manual for pressure drop ta...

Отзывы: