background image

Page 14

 7 − After a few minutes, open a refrigerant port to ensure

the refrigerant you added is adequate to be detected.
(Amounts of refrigerant will vary with line lengths.)
Check all joints for leaks. Purge nitrogen and R410A
mixture. Correct any leaks and recheck.

IMPORTANT

Leak detector must be capable of sensing HFC re-
frigerant.

Evacuation

Evacuating the system of noncondensables is critical for
proper operation of the unit. Noncondensables are defined
as any gas that will not condense under temperatures and
pressures present during operation of an air conditioning
system. Noncondensables and water vapor combine with
refrigerant to produce substances that corrode copper pip-
ing and compressor parts.

IMPORTANT

Use a thermocouple or thermistor electronic vacuum
gauge that is calibrated in microns. Use an instrument
that reads from 50 microns to at least 10,000 microns.

 1 − Connect the manifold gauge set to the service valve

ports as follows:

 

 

low pressure gauge to 

vapor

 line service valve

 

 

high pressure gauge to 

liquid 

line service valve

 2 − Connect micron gauge.

 3 − Connect the vacuum pump (with vacuum gauge) to the

center port of the manifold gauge set.

 4 − Open both manifold valves and start vacuum pump.

 5 − Evacuate the line set and indoor unit to an 

absolute

pressure

 of 23,000 microns (29.01 inches of mercu-

ry). During the early stages of evacuation, it is desir-
able to close the manifold gauge valve at least once to
determine if there is a rapid rise in 

absolute pressure

.

A rapid rise in pressure indicates a relatively large leak.
If this occurs, repeat the leak testing procedure.

NOTE − The term absolute pressure means the total
actual pressure within a given volume or system,
above the absolute zero of pressure. Absolute pres-
sure in a vacuum is equal to atmospheric pressure mi-
nus vacuum pressure.

 6 − When the absolute pressure reaches 23,000 microns

(29.01 inches of mercury), close the manifold gauge
valves, turn off the vacuum pump and disconnect the
manifold gauge center port hose from vacuum pump.
Attach the manifold center port hose to a nitrogen cylin-
der with pressure regulator set to 150 psig (1034 kPa)
and purge the hose. Open the manifold gauge valves
to break the vacuum in the line set and indoor unit.
Close the manifold gauge valves.

WARNING

Danger of Equipment Damage.
Avoid deep vacuum operation. Do not use com-
pressors to evacuate a system.
Extremely low vacuums can cause internal arcing
and compressor failure.
Damage caused by deep vacuum operation will
void warranty.

 7 − Shut off the nitrogen cylinder and remove the manifold

gauge hose from the cylinder. Open the manifold
gauge valves to release the nitrogen from the line set
and indoor unit.

 8 − Reconnect the manifold gauge to the vacuum pump,

turn the pump on, and continue to evacuate the line set
and indoor unit until the absolute pressure does not
rise above 500 microns (29.9 inches of mercury) within
a 20−minute period after shutting off the vacuum pump
and closing the manifold gauge valves.

 9 − When the absolute pressure requirement above has

been met, disconnect the manifold hose from the vacu-
um pump and connect it to an upright cylinder of R410A
refrigerant. Open the manifold gauge valves to break
the vacuum from 1 to 2 psig positive pressure in the line
set and indoor unit. Close manifold gauge valves and
shut off the R410A cylinder and remove the manifold
gauge set.

Start−Up

IMPORTANT

If unit is equipped with crankcase heater, it should be
energized 24 hours before unit start−up to prevent
compressor damage as a result of slugging.

 1 − Rotate fan to check for frozen bearings or binding.

 2 − Inspect all factory− and field-installed wiring for loose

connections.

 3 − After evacuation is complete, open the liquid line and

vapor line service valves (counterclockwise) to release
refrigerant charge (contained in outdoor unit) into the
system.

 4 − Replace stem caps and secure finger tight, then tight-

en an additional (1/6) one-sixth of a turn.

 5 − Check voltage supply at the disconnect switch. The

voltage must be within the range listed on the unit
nameplate. If not, do not start the equipment until the
power company has been consulted and the voltage
condition has been corrected.

 6 − Set the thermostat for a cooling demand, turn on power

to indoor blower unit and close the outdoor unit discon-
nect to start the unit.

 7 − Recheck voltage while the unit is running. Power must

be within range shown on the nameplate.

Содержание HPXA15 SERIES

Страница 1: ...a qualified installer or service agency INSTALLATION INSTRUCTIONS HPXA15 SERIES UNITS HEAT PUMP UNITS 504 713M 02 04 Supersedes 12 02 Table of Contents HPXA15 Outdoor Unit 1 Shipping Packing List 1 G...

Страница 2: ...in 27 7 8 25 7 8 29 7 8 12 1 4 22 7 16 14 7 16 22 1 8 16 3 4 2 7 8 5 1 2 HPXA15 024 mm 708 657 759 311 570 367 562 425 730 140 HPXA15 030 in 30 7 8 32 1 8 34 1 16 12 3 4 26 5 8 18 5 8 28 1 8 17 1 4 3...

Страница 3: ...s 1 Place a sound absorbing material such as Isomode under the unit if it will be installed in a location or posi tion that will transmit sound or vibration to the living area or adjacent buildings 2...

Страница 4: ...y support the unit Consult local codes for rooftop applications If unit coil cannot be mounted away from prevailing winter winds a wind barrier should be constructed See figure 3 Size barrier at least...

Страница 5: ...eld wiring diagram NOTE A complete unit wiring diagram is located in side the unit control box cover 3 Install room thermostat ordered separately on an in side wall approximately in the center of the...

Страница 6: ...Corp 9351 L9 for proper size type and application of field fabricated lines Valve sizes are also listed in table 1 Refrigerant Connections HPXA15 Matched with New Indoor Coil and Line Set If an existi...

Страница 7: ...ure 9 shows how to install line sets on horizontal runs Figure 10 shows how to make a transi tion from horizontal to vertical Finally figure 11 shows how to place the outdoor unit and line set Refrige...

Страница 8: ...ire Tie Wire Tie around vapor line only Floor Joist or Roof Rafter Tape or Wire Tie Strap the vapor line to the joist or rafter at 8 ft intervals then strap the liquid line to the vapor line To hang l...

Страница 9: ...e Metal Sleeve Anchored Heavy Nylon Wire Tie Automotive Muffler Type Hanger Wall Stud Wall Stud Liquid Line Vapor Line Wrapped in Armaflex Strap Liquid Line To Vapor Line Metal Sleeve Figure 10 Outsid...

Страница 10: ...Engineering Handbook for approved TXV match ups and application information Check expansion valves equipped with Chatleff fittings are available from Lennox Refer to the Engineering Handbook for appli...

Страница 11: ...ine valve Disconnect all power to the existing outdoor unit Re fer to gauges after shutdown to confirm that the valves are not allowing refrigerant to flow back into the low side of the system Disconn...

Страница 12: ...se at up to 800 psi of pressure with a 4000 psi burst rating Service Valves Access the liquid line and vapor line service valves figures 13 and 14 and gauge ports are used for leak testing eva cuating...

Страница 13: ...al injury WARNING Danger of explosion Can cause equipment damage injury or death When using a high pressure gas such as dry nitrogen to pressurize a refrigeration or air conditioning system use a regu...

Страница 14: ...set to 150 psig 1034 kPa and purge the hose Open the manifold gauge valves to break the vacuum in the line set and indoor unit Close the manifold gauge valves WARNING Danger of Equipment Damage Avoid...

Страница 15: ...e 4 When the heating demand has been satisfied switch the thermostat to cooling mode with a set point of 68 F 20 C When pressures have stabilized use a digital thermometer to record the liquid line te...

Страница 16: ...lations Significant differences could mean that the system is not properly charged or that a problem exists with some component in the system Pressures higher than those listed indicate that the syste...

Страница 17: ...door Coil E t i Ai HPXA15 024 HPXA15 030 HPXA15 036 HPXA15 042 HPXA15 048 HPXA15 060 Entering Air Temp F C Liquid Vapor Liquid Vapor Liquid Vapor Liquid Vapor Liquid Vapor Liquid Vapor 65 18 3 252 131...

Страница 18: ...506 5 43 125 0 74 214 0 105 340 5 136 512 9 44 127 3 75 217 4 106 345 3 137 519 3 45 129 7 76 220 9 107 350 1 138 525 8 46 132 2 77 224 4 108 355 0 139 532 4 47 134 6 78 228 0 109 360 0 140 539 0 48...

Страница 19: ...t control defrost relay time delay diagnostic LEDs and a terminal strip for field wiring connections See figure 17 The control provides automatic switching from normal heating operation to defrost mod...

Страница 20: ...The service light thermostat provides a signal which activates the room ther mostat service light during periods of inefficient operation Diagnostic LEDs The defrost board uses two LEDs for diagnosti...

Страница 21: ...re lubrication is needed 3 Adjust blower speed for cooling Measure the pressure drop over the coil to determine the correct blower CFM Refer to the unit information service manual for pressure drop ta...

Отзывы: