background image

Page 9

A − Plumbing

Field refrigerant piping consists of liquid and vapor lines
from the outdoor unit (sweat connections). Use Lennox
L15 (sweat) series line sets as shown in table 3.

TABLE 3

Refrigerant Line Sets

Field
Connections

Recommended Line Set

Mod-
el

Liquid
Line

Vapor
Line

Liquid
Line

Vapor
Line

L15
Line Sets

−018
−024
−030
−036

3/8 in.
(10 mm)

3/4 in
(19 mm)

3/8 in.
(10 mm)

3/4 in
(19 mm)

L15−41
15 ft. − 50 ft.
(4.6 m − 15 m)

−037
−042
−048

3/8 in.
(10 mm)

7/8 in
(22 mm)

3/8 in.
(10 mm)

7/8 in
(22 mm)

L15−65
15 ft. − 50 ft.
(4.6 m − 15 m)

−060

3/8 in.
(10 mm)

1−1/8 in.
(29 mm)

3/8 in.
(10 mm)

1−1/8 in.
(29 mm)

Field
Fabricated

B − Service Valves

IMPORTANT

Only use Allen wrenches of sufficient hardness
(50Rc − Rockwell Harness Scale min). Fully in-
sert the wrench into the valve stem recess.
Service valve stems are factory torqued (from 9
ft lbs for small valves, to 25 ft lbs for large
valves) to prevent refrigerant loss during ship-
ping and handling. Using an Allen wrench rated
at less than 50Rc risks rounding or breaking off
the wrench, or stripping the valve stem recess.

Service valves (figures 13 and 14) and gauge ports are ac-
cessible from the outside of the unit. Use the service ports
for leak testing, evacuating, charging and checking charge.

Each valve is equipped with a service port which has a fac-
tory−installed Schrader valve. A service port cap protects
the Schrader valve from contamination and serves as the
primary leak seal.

To Access Schrader Port:

 1 − Remove service port cap with an adjustable wrench.
 2 − Connect gauge to the service port.
 3 − When testing is complete, replace service port cap. Tight-

en finger tight, then an additional 1/6 turn.

To Open Service Valve:

 1 − Remove the stem cap with an adjustable wrench.
 2 − Use a service wrench with a hex−head extension to

back the stem out counterclockwise as far as it will go.

NOTE − Use a 3/16" hex head extension for 3/8" line
sizes or a 5/16" extension for large line sizes.

 3 − Replace the stem cap. Tighten finger tight, then tighten

an additional 1/6 turn.

To Close Service Valve:

 1 − Remove the stem cap with an adjustable wrench.

 2 − Use a service wrench with a hex−head extension to turn

the stem clockwise to seat the valve. Tighten the stem
firmly.

NOTE − Use a 3/16" hex head extension for 3/8" line
sizes or a 5/16" extension for large line sizes.

 3 − Replace the stem cap. Tighten finger tight, then tighten

an additional 1/6 turn.

Service Valve

(Valve Closed)

Schrader valve open

to line set when valve is

closed (front seated)

service

port

service

port cap

stem cap

insert hex

wrench here

(valve front seated)

to outdoor coil

to indoor coil

Service Valve

(Valve Open)

Schrader

valve

service

port

service port

cap

insert hex

wrench here

to indoor coil

to outdoor coil

stem cap

FIGURE 13

Vapor Line Ball Valve –  5 Ton Only

Vapor line service valves function the same way as the oth-
er valves, the difference is in the construction. If a valve has
failed, you must replace it. A ball valve is illustrated in figure
14.

Содержание Elite XP13018

Страница 1: ...RNING Warranty will be voided if covered equipment is re moved from original installation site Warranty will not cover damage or defect resulting from Flood wind lightning or installation and opera ti...

Страница 2: ...230V 208 230V 208 230V 3 Maximum overcurrent protection amps 20 30 30 35 35 40 50 60 2 Minimum circuit ampacity 11 9 17 5 18 4 21 6 21 9 23 2 28 9 34 6 Compressor Rated load amps 8 97 13 46 14 1 16 6...

Страница 3: ...1 OUTDOOR FAN COMPRESSOR HIGH PRESSURE SWITCH REVERSING VALVE FILTER DRIER CONTROL BOX EXPANSION VALVE VAPOR LINE SERVICE VALVE LIQUID LINE SERVICE VALVE A Control Box Figure 2 XP13 units are not equi...

Страница 4: ...the TEST position at power up the control will ignore the test pins When the jumper is placed across the TEST pins for two seconds the control will enter the defrost mode If the jumper is removed befo...

Страница 5: ...TION CROSS SECTION OF SCROLLS TIPS SEALED BY DISCHARGE PRESSURE DISCHARGE PRESSURE The counterclockwise orbiting scroll draws gas into the outer crescent shaped gas pocket created by the two scrolls f...

Страница 6: ...oving the four screws securing the fan assembly See figure9 The grill fan assembly can be removed from the cabinet as one piece See figure 10 The condenser fan motor is removed from the fan guard by r...

Страница 7: ...pole single throw high pressure switch is located in the liquid line This switch shuts off the compres sor when liquid line pressure rises above the factory setting The switch is normally closed and i...

Страница 8: ...ON OF REFRIGERANT FLOW SERVICE PORT SUCTION EXPANSION CHECK VALVE INDOOR UNIT OUTDOOR UNIT LIQUID LINE SERVICE PORT GAUGE MANIFOLD INTERNAL COMPRESSOR LIMIT DISTRIBUTOR INDOOR COIL COIL SENSOR FIGURE...

Страница 9: ...ation and serves as the primary leak seal To Access Schrader Port 1 Remove service port cap with an adjustable wrench 2 Connect gauge to the service port 3 When testing is complete replace service por...

Страница 10: ...only 3 Open the high pressure side of the manifold to allow the R 410A into the line set and indoor unit Weigh in a trace amount of R 410A A trace amount is a maximum of 2 ounces 57 g or 3 pounds 31 k...

Страница 11: ...urn the pump on and continue to evacuate the line set and indoor unit until the absolute pressure does not rise above 500 microns 29 9 inches of mercury within a 20 minute period after shutting off th...

Страница 12: ...5 Charge Using the Approach Method Outdoor Temperature 65 F 18 C The following procedure is intended as a general guide and is for use on expansion valve systems only For best results indoor temperatu...

Страница 13: ...0A refriger ant absorb moisture very quickly It is very impor tant that the refrigerant system be kept closed as much as possible DO NOT remove line set caps or service valve stub caps until you are r...

Страница 14: ...the coil to determine the correct blower CFM Refer to the unit information service manual for pressure drop tables and procedure 3 Belt Drive Blowers Check belt for wear and proper ten sion 4 Check a...

Страница 15: ...Page 15 VIII WIRING DIAGRAM AND SEQUENCE OF OPERATION 5 6 1 2 4 3 3 6...

Страница 16: ...tdoor fan motor B4 are de energized and stop immediately Terminal O is de energized when indoor room thermo stat is out of cooling mode de energizing the reversing valve L1 Heating demand initiates at...

Отзывы: