Refrigerant Piping - Install Indoor Expansion Valve 

This outdoor unit is designed for use in systems that include a heat pump expansion valve metering device (purchased 

separately) at the indoor coil. See the Product Specifications for approved expansion valve kit match-ups and application 

information. The check expansion valve unit can be installed internal or external to the indoor coil. In applications where an 

uncased coil is being installed in a field-provided plenum, install the check/expansion valve in a manner that will provide 

access for future field service of the expansion valve. Refer to below illustration for reference during installation of expansion 

valve unit.

 1 -

Attach  the  vapor  line  sensing  bulb  in  the  proper

orientation as illustrated to the right using the clamp and

screws provided.

NOTE - Though it is preferred to have the sensing bulb

installed on a horizontal run of the vapor line, installation

on a vertical run of piping is acceptable if necessary.
NOTE - Confirm proper thermal contact between vapor

line  and  check/expansion  bulb  before  insulating  the

sensing bulb once installed.

 2 -

Connect the equalizer line from the check expansion

valve to the equalizer vapor port on the vapor line. Finger

tighten the flare nut plus 1/8 turn (7 ft-lbs) as illustrated

below.

TWO PIECE

PATCH PLATE

(UNCASED

COIL ONLY)

VAPOR

LINE

LIQUID LINE

ORIFICE

HOUSING

DISTRIBUTOR

TUBES

LIQUID LINE

MALE EQUALIZER LINE

FITTING (SEE

EQUALIZER LINE

INSTALLATION FOR

FURTHER DETAILS)

SENSING

LINE

EQUALIZER

LINE

CHECK

EXPANSION

VALVE

TEFLON

®

RING

(Uncased Coil Shown)

Sensing  bulb  insulation  is  required  if

mounted external to the coil casing. sensing

bulb installation for bulb positioning.

STUB

END

TEFLON

®

RING

LIQUID LINE

ASSEMBLY WITH

BRASS NUT

DISTRIBUTOR

ASSEMBLY

 3 -

Install one of the provided Teflon

®

 rings around the

stubbed end of the check expansion valve and lightly

lubricate the connector threads and expose surface of

the Teflon

®

 ring with refrigerant oil.

 4 -

Attach the stubbed end of the check expansion valve to

the liquid line orifice housing. Finger tighten and use an

appropriately sized wrench to turn an additional 1/2 turn

clockwise as illustrated in the figure above, or tighten to

20 ft-lb.

 5 -

Place the remaining Teflon

®

 washer around the other

end  of  the  check  expansion  valve.  Lightly  lubricate

connector threads and expose surface of the Teflon

®

ring with refrigerant oil.

 6 -

Attach the liquid line assembly to the check expansion

valve.  Finger  tighten  and use an appropriately sized

wrench  to  turn  an  additional  1/2  turn  clockwise  as

illustrated in the figure above or tighten to 20 ft-lb.

ON  7/8”  AND  LARGER LINES,

MOUNT  SENSING  BULB  AT

EITHER THE 4 OR 8 O'CLOCK

POSITION.

12

ON LINES SMALLER THAN

7/8”,  MOUNT  SENSING

BULB AT EITHER THE 3 OR

9 O'CLOCK POSITION.

12

BULB

VAPOR LINE

VAPOR LINE

NOTE - NEVER MOUNT THE SENSING BULB ON

BOTTOM OF LINE.

BULB

BULB

BULB

VAPOR LINE

FLARE NUT

COPPER FLARE

SEAL BONNET

MALE BRASS EQUALIZER

LINE FITTING

FLARE SEAL CAP

OR

1

2

3

4

5

6

7

8

9

10

11 12

1/2 Turn

SENSING BULB INSTALLATION

EQUALIZER LINE INSTALLATION

1

2

3

4

5

6

7

8

9

10

11 12

1/8 Turn

 1 -

Remove and discard either the flare seal cap or flare nut

with copper flare seal bonnet from the equalizer line port

on the vapor line as illustrated in the figure below.

 2 -

Remove the field-provided 

sembly.

INDOOR EXPANSION VALVE INSTALLATION

Содержание 4HP14

Страница 1: ...alified personnel and do not supersede any national or local codes in any way The installation must comply with all provincial state and local codes as well as the National Electrical Code U S or Cana...

Страница 2: ...nstalled on a solid foundation This foundation should extend a minimum of 2 inches beyond the sides of the outdoor section To reduce the possibility of noise transmission the foundation slab should NO...

Страница 3: ...l or other barrier Table 2 Clearances 30 around Control Box 24 6 NOTE See Table 2 for specific minimum clearance guidelines Figure 2 DO LOCATE THE UNIT With proper clearances on sides and top of unit...

Страница 4: ...8 042 3 8 3 8 7 8 7 8 048 3 8 3 8 7 8 7 8 060 3 8 3 8 7 8 1 1 8 Field supplied 7 8 x 1 1 8 connector required on both ends of vapor tubing Table 3 Recommended Liquid Vapor Tube Diameters in Be extra c...

Страница 5: ...UNIT VAPOR LINE SERVICE VALVE VAPOR LIQUID 1 A B C D A Cylinder with clean R 410A positioned to deliver liquid refrigerant to the vapor service valve B Refrigerant gauge set low side to the liquid lin...

Страница 6: ...il Shown Sensing bulb insulation is required if mounted external to the coil casing sensing bulb installation for bulb positioning STUB END TEFLON RING LIQUID LINE ASSEMBLY WITH BRASS NUT DISTRIBUTOR...

Страница 7: ...ound Do not crimp end of the line Remove service cap and core from both the vapor and liquid line service ports 1 2 LIQUID LINE SERVICE VALVE SERVICE PORT CORE SERVICE PORT CAP SERVICE PORT CORE SERVI...

Страница 8: ...ES POINT FLAME AWAY FROM SERVICE VALVE PREPARATION FOR NEXT STEP 7 WRAP SERVICE VALVES To help protect service valve seals during brazing wrap water saturated cloths around service valve bodies and co...

Страница 9: ...of the manifold gauge set in order to pressurize the line set and the indoor unit E After a few minutes open one of the service valve ports and verify that the refrigerant added to the system earlier...

Страница 10: ...id refrigerant Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the line set and indoor unit G Perform the following Close manifold gauge valves Shut off HFC 410A cylinder R...

Страница 11: ...nch with a hex head extension to back the stem out counterclockwise as far as it will go Use a 3 16 hex head extension for liquid line service valves and a 5 16 extension for suction line service valv...

Страница 12: ...the low voltage field wiring 2 Ground unit at unit disconnect switch or to an earth ground To facilitate conduit a hole is in the bottom of the control box Connect conduit to the control box using a...

Страница 13: ...or varying lengths of line set refer to Table 4 for refrigerant charge adjustment A blank space is provided on the unit rating plate to list the actual field charge Table 4 Refrigerant Charge Adjustme...

Страница 14: ...for 90 seconds following the start up of the compressor during test mode High Pressure Switch HI PS When the high pressure switch trips the defrost board will cycle off the compressor and the strike c...

Страница 15: ...ition at power up the control will ignore the test pins When the jumper is placed across the TEST pins for 2 seconds the control will enter the defrost mode If the jumper is removed before an addition...

Страница 16: ...ent fins may affect unit operation SHARP OBJECT HAZARD Condenser coils have sharp edges Wear adequate body protection on body extremities e g gloves FAILURE TO FOLLOW THIS WARNING COULD RESULT IN BODI...

Страница 17: ...he defrost cycle In case of extended power outage If the outdoor temperature is below 50 F and power to your outdoor unit has been interrupted for one hour or longer observe the following when restori...

Страница 18: ...506318 03 Page 18 of 18 Issue 1946 Figure 8 14 15 SEER Wiring Diagram...

Отзывы: