background image

Page 3 of 18

506318-03

Issue 1946

Discharge Air

Mounting Slab

Ground Level

Building

Structure

Mounting slab must slope slightly away from 

building, not to exceed 1/4” per foot.

Figure 1. Slab Mounting

Elevate Unit

Accumulation of water and ice in base pan may cause 

equipment damage.

 CAUTION

Elevate unit per local climate and code requirements to 

provide clearance above estimated snowfall level and 

ensure adequate drainage of unit. Use snow stand in areas 

where prolonged freezing temperatures are encountered.

If conditions or local codes require the unit be attached to 

pad or mounting frame, tie down bolts should be used and 

fastened through knockouts provided in unit base pan.

Clearance Requirements

When installing, allow sufficient space for airflow clearance, 

wiring, refrigerant piping, and service. For proper airflow, 

quiet operation and maximum efficiency. Position so water, 

snow, or ice from roof or eaves cannot fall directly on unit. 

Refer to Table 2 for installation clearances.

Location

Minimum Clearance

Service box

30”

Top of unit*

48”

Between units

24”

Against wall

6”

* Maximum soffit overhang is 36”.

NOTE

: At least one side should be unobstructed by a wall or 

other barrier.

Table 2.  Clearances

30” around

Control

Box

24”

6”*

NOTE: See Table 2 for specific minimum 

clearance guidelines.

Figure 2.  

DO LOCATE THE UNIT:

•  With proper clearances on sides and top of unit
•  On a solid, level foundation or pad (unit must be level 

to within ± 1/4 in./ft. per compressor manufacturer 

specifications)

•  To minimize refrigerant line lengths

DO NOT LOCATE THE UNIT:

•  On brick, concrete blocks or unstable surfaces
•  Near clothes dryer exhaust vents where debris 

accumulates

•  Near sleeping area or near windows
•  Under eaves where water, snow or ice can fall directly 

on the unit 

•  With clearance less than 2 ft. from a second unit
•  With clearance less than 4 ft. on top of unit

Operating Ambient

The minimum outdoor operating ambient in cooling mode 

is 55°F, and the maximum outdoor operating ambient in 

cooling mode is 125°F. The maximum outdoor operating 

ambient in heating mode is 66°F.

Rooftop Installations

Install unit at a minimum of 6” above surface of the roof 

to avoid ice buildup around the unit. Locate the unit 

above a load bearing wall or area of the roof that can 

adequately support the unit. Consult local codes for rooftop 

applications.

If unit cannot be mounted away from prevailing winds, a 

wind barrier should be constructed. Due to variation in 

installation applications, size and locate barrier according 

to the best judgment of the installer.

Содержание 4HP14

Страница 1: ...alified personnel and do not supersede any national or local codes in any way The installation must comply with all provincial state and local codes as well as the National Electrical Code U S or Cana...

Страница 2: ...nstalled on a solid foundation This foundation should extend a minimum of 2 inches beyond the sides of the outdoor section To reduce the possibility of noise transmission the foundation slab should NO...

Страница 3: ...l or other barrier Table 2 Clearances 30 around Control Box 24 6 NOTE See Table 2 for specific minimum clearance guidelines Figure 2 DO LOCATE THE UNIT With proper clearances on sides and top of unit...

Страница 4: ...8 042 3 8 3 8 7 8 7 8 048 3 8 3 8 7 8 7 8 060 3 8 3 8 7 8 1 1 8 Field supplied 7 8 x 1 1 8 connector required on both ends of vapor tubing Table 3 Recommended Liquid Vapor Tube Diameters in Be extra c...

Страница 5: ...UNIT VAPOR LINE SERVICE VALVE VAPOR LIQUID 1 A B C D A Cylinder with clean R 410A positioned to deliver liquid refrigerant to the vapor service valve B Refrigerant gauge set low side to the liquid lin...

Страница 6: ...il Shown Sensing bulb insulation is required if mounted external to the coil casing sensing bulb installation for bulb positioning STUB END TEFLON RING LIQUID LINE ASSEMBLY WITH BRASS NUT DISTRIBUTOR...

Страница 7: ...ound Do not crimp end of the line Remove service cap and core from both the vapor and liquid line service ports 1 2 LIQUID LINE SERVICE VALVE SERVICE PORT CORE SERVICE PORT CAP SERVICE PORT CORE SERVI...

Страница 8: ...ES POINT FLAME AWAY FROM SERVICE VALVE PREPARATION FOR NEXT STEP 7 WRAP SERVICE VALVES To help protect service valve seals during brazing wrap water saturated cloths around service valve bodies and co...

Страница 9: ...of the manifold gauge set in order to pressurize the line set and the indoor unit E After a few minutes open one of the service valve ports and verify that the refrigerant added to the system earlier...

Страница 10: ...id refrigerant Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the line set and indoor unit G Perform the following Close manifold gauge valves Shut off HFC 410A cylinder R...

Страница 11: ...nch with a hex head extension to back the stem out counterclockwise as far as it will go Use a 3 16 hex head extension for liquid line service valves and a 5 16 extension for suction line service valv...

Страница 12: ...the low voltage field wiring 2 Ground unit at unit disconnect switch or to an earth ground To facilitate conduit a hole is in the bottom of the control box Connect conduit to the control box using a...

Страница 13: ...or varying lengths of line set refer to Table 4 for refrigerant charge adjustment A blank space is provided on the unit rating plate to list the actual field charge Table 4 Refrigerant Charge Adjustme...

Страница 14: ...for 90 seconds following the start up of the compressor during test mode High Pressure Switch HI PS When the high pressure switch trips the defrost board will cycle off the compressor and the strike c...

Страница 15: ...ition at power up the control will ignore the test pins When the jumper is placed across the TEST pins for 2 seconds the control will enter the defrost mode If the jumper is removed before an addition...

Страница 16: ...ent fins may affect unit operation SHARP OBJECT HAZARD Condenser coils have sharp edges Wear adequate body protection on body extremities e g gloves FAILURE TO FOLLOW THIS WARNING COULD RESULT IN BODI...

Страница 17: ...he defrost cycle In case of extended power outage If the outdoor temperature is below 50 F and power to your outdoor unit has been interrupted for one hour or longer observe the following when restori...

Страница 18: ...506318 03 Page 18 of 18 Issue 1946 Figure 8 14 15 SEER Wiring Diagram...