INSTALLATION
CHILLER-IOM-2004-E
9
INSTALLATION
1.
TRANSPORT
–
HANDLING
All unloading operations must be carried out with suitable equipment (crane, forklift truck, etc.). Optional removable handling rings are
available for certain products.
When using a forklift truck, you must respect the positions and the direction of handling indicated on the products. The equipment must be
handled with care to avoid damage to the bodywork, pipework, condenser, etc.
1.1.
Controls and delivery checks
After the unit has been received, when it is ready to be installed or reinstalled, and before it is started up, it must be inspected for damage.
On receipt of anew equipment please check the following points. It is the customer’s responsibility to ensure that the products are in good
working order.
•
The exterior has not been damaged in any way.
•
The lifting and handling equipment are suitable for the equipment and comply with the specifications of the handling instructions
enclosed here-in.
•
Accessories ordered for on site installation have been delivered and are in good working order.
•
If the unit is delivered with its operating charge of refrigerant, that there has been no leakage (use an electronic detector).
•
The equipment supplied corresponds to the order and matches the delivery note.
If the product is damaged, exact details must be confirmed in writing by registered post to the shipping company within 48 hours of delivery
(working days).
A copy of the letter must be addressed to LENNOX and the supplier or distributor for information purposes. Failure to
comply will invalidate any claim against the shipping company.
Please be reminded that LENNOX is not responsible for off-loading and positioning.
1.1.1.
Unit Nameplate
The rating plate provides a complete reference for the model and ensures that the unit corresponds to the model ordered. It states the
electrical power consumption of the unit on start-up, its rated power and its supply voltage.
The supply voltage must not deviate 5/-5 %.
The start-up power is the maximum value likely to be achieved for the specified operational voltage. The customer must have a suitable
electrical supply.
It is therefore important to check whether the supply voltage stated on the unit’s rating plate is compatible with that of the
mains electrical supply.
The rating plate also states:
• year of manufacture
• weight of the unit
• type of refrigerant used + GWP*
(*Global warming potential)
• required charge for each circuit
• operating Pressure min/max
• operating Temperature min/max
CE marking: 5 possible cases
-
CE
-
CE0038
This product is used for Air Conditioning. Contains fluorinated greenhouse gases
covered by the Kyoto protocol. Hermetically sealed.