
M3000 Installation Guide
67
8RP Board
Powering Two 8RP Boards
To wire each 8RP board:
1.
Connect an 18- or 20- gauge wire from Power/Communications board J6 Pin 1 (+12 VDC) to
8RP board J5 Pin 1 (+12 VDC)
2.
Connect an 18- or 20- gauge wire from Power/Communications board J6 Pin 2 (GND) to 8RP
board J5 Pin 2 (GND)
3.
Connect the power supply (5 A or higher required) to Power/Communications board J6 Pin 3
(+12 VDC) and Pin 4 (GND).
Wiring Readers
To wire a reader:
1.
Mount the reader. Refer to the manual that came with your reader for specific mounting
instructions.
2.
Run cable from the reader to the controller. Bring each reader cable through the appropriate
knockout hole in the controller cabinet. Allow some slack wire for servicing the cables and for
plugging the cable into an adjacent slot for troubleshooting.
3.
Remove 8 inches (20.32 cm) of insulating material from the cable. Unwrap shielding and tie all
shields together. Connect the communications cable shield to the ground nut adjacent to the cable
entrance knockout of the cabinet enclosure. For more details, refer to figure
Using Shielded Cable/drain Wire - Outside and Inside the Enclosure
.
4.
Place the appropriate wires to the appropriate screw terminal on the 8RP reader board. Refer to
the reader wiring diagrams in this section. Pairing of cables is very important.
Caution:
The
8RP board has built-in pull-up resistors. Do not install the external
pull-up resistors supplied with Proximity Readers.
5.
Label each cable end with Controller Address Number/Device or Reader Number.
We recommend using 20-AWG shielded cable for wiring reader DOs and DIs. Use plenum-rated
cable for applications where cable is to be run above the false (suspended) ceiling in the air
circulation space.
The following cable types are recommended:
Содержание m3000
Страница 1: ...7 3 M3000 Installation Guide...
Страница 4: ......
Страница 14: ...Introduction 14 M3000 Installation Guide...
Страница 24: ...Power Communications Board 24 M3000 Installation Guide Power Communications Board Layout Power Setup...
Страница 30: ...Power Communications Board 30 M3000 Installation Guide...
Страница 32: ...PXNplus CPU Board 32 M3000 Installation Guide PXNplus CPU Board Layout...
Страница 38: ...Reader Processing Boards 38 M3000 Installation Guide 2RP Board Layout 2RP Board Layout...
Страница 50: ...Reader Processing Boards 50 M3000 Installation Guide 2SRP Board Layout 2SRP Board Layout...
Страница 55: ...M3000 Installation Guide 55 2SRP Board 2SRP Supervised Reader Connector Points...
Страница 57: ...M3000 Installation Guide 57 2SRP Board Wiring 2SRP to Wiegand F 2F Strobed and Supervised F 2F Reader...
Страница 61: ...M3000 Installation Guide 61 2SRP Board Wiring 2SRP Door Strike Internal Relay...
Страница 65: ...M3000 Installation Guide 65 8RP Board Board Layout 8RP Board Layout...
Страница 70: ...Reader Processing Boards 70 M3000 Installation Guide...
Страница 72: ...Optional DI and DO Boards 72 M3000 Installation Guide 20DI Board Layout 20DI Board Layout...
Страница 75: ...M3000 Installation Guide 75 16DO and 16DOR Boards 16DO Board Layout...
Страница 76: ...Optional DI and DO Boards 76 M3000 Installation Guide 16DOR Board Layout...
Страница 80: ...Pre Power Up Testing 80 M3000 Installation Guide...
Страница 99: ...M3000 Installation Guide 99 CE Regulatory Notice CE Regulatory Notice...
Страница 100: ...Regulatory Information 100 M3000 Installation Guide...
Страница 110: ...110 M3000 Installation Guide...
Страница 114: ...114 M3000 Installation Guide Resistances Detected by PXNplus...
Страница 117: ...M3000 Installation Guide 117 Index...