4.1 Checking of delivery
Before commencing work with the analyzer, check the delivery
to ensure that it is compete, using the following list and the
delivery specifications:
-
1 power analyzer
-
1 operating manual
-
1 mains cable
-
1 calibration certificate
-
1 to 6 voltage and current channel modules, according to
the delivery specifications
4.2 Installation and switching on
Follow the safety instructions regarding ambient conditions and
location of installation.
F
eh
ler! A
u
to
T
ext-E
in
trag
n
ich
t d
efin
iert.
Danger! Risk of electrocution
Caution! The device is connected to the power mains, and a
number of internal components are live with dangerous voltage
levels. To remain safe during operation, the device must be
equipped with a low-resistance connection to the earth.
Therefore check the mains socket and its wiring!
Place the device onto a clean and stable surface.
If necessary adjust the feet at the base of the unit to improve
the view onto the display.
Connect the device to the mains socket, using the power lead.
Set the power switch at the rear of the housing to position "I".
The device is now ready for operation. The start screen is
displayed.
Set the power switch at the rear of the housing to position "0".
If the device is not to be used for a prolonged period of time,
disconnect the plug from the mains socket.
Installation
Switching device
on
Switching device
off