
Understanding Stake and Check Basics
267
11.6
Stake and Info Screens
Two positions
When staking out you are first of all interested in finding the position you want to place the
peg. In the next step you have to write the required information on the peg.
Two steps
Stake out may be divided into two sequential steps:
The dialog used for stake out in RoadRunner reflects these two steps. One page, the
Stake
page, is used as a guide to the peg position and a second page, the
Info
page, indicates the
values to mark on the peg.
Step
Description
1.
Find the position to place the peg.
2.
Mark the information on the peg that allows its final position to be determined.
The first step:
Stake - The
Stake
page is used for the first step of the
actual stake out. It guides you to the position to be
staked out. If the values for
∆
Chainage
and
∆
Offset
are close enough to 0 you are in the right position to
place the peg.
Содержание RoadRunner
Страница 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Страница 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Страница 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Страница 121: ...Step 4 Measuring RoadRunner 121 ...
Страница 158: ...158 RoadRunner Configuring Screen ...
Страница 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Страница 191: ...Configuring RoadRunner 191 ...
Страница 201: ...Managing the Project RoadRunner 201 ...
Страница 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Страница 251: ...Working with the Extras Menu RoadRunner 251 ...
Страница 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Страница 340: ...i 340 RoadRunner Index ...
Страница 341: ...Index RoadRunner i 341 ...