
156
Configuring
a) Vertical chainage
Vert Chainage
b) Chainage
Chainage
c) Centreline
d) Centreline height difference
CL Ht Diff
e) Vertical square offset
Vert Sqr Off
CL Grade
Output
Grade of the centre line at the current position.
Dirc to Point
Output
Direction from the current position to the point to
stake out.
Dist to Point
Output
Distance from the current position to the point to
stake out.
Def Easting
Output
Easting of the point to stake out.
Def Northing
Output
Northing of the point to stake out.
Def Height
Output
Height of the point to stake out.
Act Easting
Output
Easting of the current position.
Act Northing
Output
Northing of the current position.
Act Height
Output
Height of the current position.
Field
Option
Description of Field
b
a
c
d
e
RR12_089
Содержание RoadRunner
Страница 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Страница 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Страница 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Страница 121: ...Step 4 Measuring RoadRunner 121 ...
Страница 158: ...158 RoadRunner Configuring Screen ...
Страница 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Страница 191: ...Configuring RoadRunner 191 ...
Страница 201: ...Managing the Project RoadRunner 201 ...
Страница 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Страница 251: ...Working with the Extras Menu RoadRunner 251 ...
Страница 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Страница 340: ...i 340 RoadRunner Index ...
Страница 341: ...Index RoadRunner i 341 ...