
Understanding Stake and Check Basics
259
11.4
Shifts
11.4.1
Overview
Description
When working on site, it is often the case that design data does not match the measured
data. For example, an existing road surface that should intersect with the design surface may
be 15 cm higher than the plans indicate. To guarantee a smooth intersection, this difference
has to be distributed over the remaining 100 m of paving. To handle these situations, Road-
Runner allows the possibility of adding shifts to the existing design data. A shift is applied
when selecting the element to stake out/check.
)
Note that shifts do not change the stored design. They are applied temporarily for stake out
purpose.
Horizontal and vertical
shifts
Horizontal shifts are always rectangular to the centre line of the element you are working
with. Whereas vertical shifts defined along the plumb line.
a) Horizontal alignment with
constant shift
b) Vertical alignment with constant
shift
b
RR12 013
a
Содержание RoadRunner
Страница 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Страница 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Страница 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Страница 121: ...Step 4 Measuring RoadRunner 121 ...
Страница 158: ...158 RoadRunner Configuring Screen ...
Страница 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Страница 191: ...Configuring RoadRunner 191 ...
Страница 201: ...Managing the Project RoadRunner 201 ...
Страница 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Страница 251: ...Working with the Extras Menu RoadRunner 251 ...
Страница 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Страница 340: ...i 340 RoadRunner Index ...
Страница 341: ...Index RoadRunner i 341 ...