
Configuring
183
Available items
a) Relevant triangle of the DTM
b) Projected point on DTM
c) Easting
d) Northing
e)
DTM Ht Diff
f)
Flow Directn
g)
Flow Ratio
Field
Option
Description of Field
DTM Task
Output
Name defined for the DTM task.
DTM Ht Diff
Output
Vertical height difference to the DTM.
∆
Height
Output
Height difference to the layer.
DTM Height
Output
Height of the DTM at the current measured position.
Flow Directn
Output
Direction of maximum slope ratio on the current DTM
triangle. This is the direction water would flow
towards from the projected point.
Flow Ratio
Output
Slope ratio of the DTM. This is the maximum slope
ratio of the triangle.
DTM Name
Output
Name of the DTM surface.
Act Easting
Output
Easting of the current position.
a
e
g
f
c
b
RR12_046
d
Содержание RoadRunner
Страница 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Страница 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Страница 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Страница 121: ...Step 4 Measuring RoadRunner 121 ...
Страница 158: ...158 RoadRunner Configuring Screen ...
Страница 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Страница 191: ...Configuring RoadRunner 191 ...
Страница 201: ...Managing the Project RoadRunner 201 ...
Страница 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Страница 251: ...Working with the Extras Menu RoadRunner 251 ...
Страница 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Страница 340: ...i 340 RoadRunner Index ...
Страница 341: ...Index RoadRunner i 341 ...